Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Fifth Amendment) Regulations, 2018
AmendmentDated 2 Jan 2019No. PM/NOAR/2016/CERC dated 02, January, 2019
Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Open Access in inter-State Transmission Regulations, 2008.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Fifth Amendment to CERC's 2008 Open Access in inter-State Transmission Regulations, notified 2 January 2019 (p1), is the instrument that creates the National Open Access Registry (NOAR). It is a platform- and process-building amendment rather than a pricing change.
Clause 3 inserts a new Regulation 3A: NOAR is a common single-window electronic platform for short-term open access, with nine enumerated functions — automating open access administration, serving short-term customers, trading licensees, power exchanges, NLDC, RLDCs, SLDCs and Regional Power Committees, keeping an audit trail and dashboards of applications approved, rejected or pending, acting as a repository of standing clearances and corridor availability, interfacing with RLDC/SLDC application software and power exchanges, hosting a payment gateway, generating market-monitoring reports, and any further function assigned by the Commission (pp1–2). NLDC is the nodal agency for implementation, cyber security compliance, disaster recovery and periodic review, with cost recovery routed through the RLDC Fees and Charges Regulations, 2009 (pp2–3). Clause 4 substitutes Regulation 4 so that NLDC issues the detailed procedure, after stakeholder consultation and Commission approval (p3).
Clause 6 introduces mandatory registration in NOAR, with a registration fee, a renewal charge and a fixed validity period (pp3–4). Clause 9 substitutes Regulation 8, replacing the old concurrence regime with an online 'standing clearance' regime: declarations on non-double-selling and metering infrastructure, verification of metering infrastructure and surplus corridor capacity, deadlines for issuing or refusing clearance, reminder messages and deemed grant where the RLDC/SLDC does not respond, a per-15-minute-block cap on scheduled quantum tied to the clearance, debarment for exceeding it, and revision of clearance for transmission constraints or grid security (pp4–6).
The remaining clauses route the whole short-term open access workflow through NOAR — application submission, acceptance and reasons, electronic bidding for congestion management, day-ahead and contingency scheduling, a new procedure for collective transactions from power exchanges, schedule revision, curtailment communication, online payment of all charges, and information publication, now an obligation of NOAR rather than RLDC/NLDC websites (pp6–9). A new proviso to Regulation 25A allows NLDC or the RLDC to deny short-term open access to a payer in default beyond a stated period without seeking Commission directions (p8). Commencement is deferred to a date to be separately notified (p1). The closing Note traces the Principal Regulations and the four earlier amendments plus a 2009 corrigendum, with gazette citations (pp9–10).
Read with this
The regulation
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
Amendments and corrections
- Dated 20 May 2009Open Access in inter-State Transmission (Amendment) Regulations, 2009
- Dated 10 Jun 2009Open Access in inter-State Transmission Regulations, 2008 — Corrigendum, 2009
- Dated 10 Jun 2009Open Access (Amendment) Regulations, 2009 — Corrigenda
- Dated 11 Sep 2013Open Access in inter-State Transmission (Second Amendment) Regulations, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 12 Dec 2019Open Access in inter-State Transmission (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020Open Access Regulations, 2008 — Sixth Amendment — Commencement Notification, 2020
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 4 Mar 2008Open Access in Inter-State Transmission System Regulations, 2008 — Statement of Reasons
- Dated 1 Jul 2009Open Access in Inter-State Transmission Regulations, 2008 — 2009 Amendment — Statement of Reasons
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015 — Statement of Objects and Reasons
- Dated 12 Jul 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016 — Statement of Objects and Reasons
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 21 Mar 2022Notification — effective date 01.05.2022
- Dated 21 Mar 2022Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Commencement Notification
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 1 Apr 2022Approval of Procedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
- Dated 1 Apr 2022Short Term Open Access in Inter-State Transmission through NOAR — Procedure, 2022
- Dated 6 May 2022Corrigendum to the NOAR STOA Procedure Order, 2022
- Date not statedProcedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
Other copies of these documents (6)
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
- Dated 11 Sep 2013Open Access in inter-State Transmission Regulations, 2008 — Second Amendment, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019
Earlier drafts
- Dated 3 Jul 2014Open Access in inter-State Transmission Regulations, 2008 — Third Amendment, 2014 — Draft
- Dated 3 Jul 2014Public notice: Open Access in inter-State Transmission (Third Amendment) Regulations, 2014 — Public Notice — Draft
- Released with the notice dated 3 Jul 2014Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Third Amendment, 2014 — Explanatory Memorandum — Draft
- Dated 3 May 2016Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Draft
- Dated 3 May 2016Public notice: Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 3 May 2016Explanatory memorandum: Open Access in Inter-state Transmission (Fourth Amendment) Regulations, 2016 — Explanatory Memorandum — Draft
- Dated 8 Aug 2018Open Access in inter-State Transmission Regulations, 2008 — Fifth Amendment, 2018 — Draft
- Released with the notice dated 8 Aug 2018Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Fifth Amendment — Draft Explanatory Memorandum
- Dated 8 Aug 2018Public notice: Draft Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Public Notice
- Dated 6 Aug 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.