Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018

Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Fifth Amendment) Regulations, 2018

AmendmentDated 2 Jan 2019No. PM/NOAR/2016/CERC dated 02, January, 2019

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Open Access in inter-State Transmission Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Fifth Amendment to CERC's 2008 Open Access in inter-State Transmission Regulations, notified 2 January 2019 (p1), is the instrument that creates the National Open Access Registry (NOAR). It is a platform- and process-building amendment rather than a pricing change.

Clause 3 inserts a new Regulation 3A: NOAR is a common single-window electronic platform for short-term open access, with nine enumerated functions — automating open access administration, serving short-term customers, trading licensees, power exchanges, NLDC, RLDCs, SLDCs and Regional Power Committees, keeping an audit trail and dashboards of applications approved, rejected or pending, acting as a repository of standing clearances and corridor availability, interfacing with RLDC/SLDC application software and power exchanges, hosting a payment gateway, generating market-monitoring reports, and any further function assigned by the Commission (pp1–2). NLDC is the nodal agency for implementation, cyber security compliance, disaster recovery and periodic review, with cost recovery routed through the RLDC Fees and Charges Regulations, 2009 (pp2–3). Clause 4 substitutes Regulation 4 so that NLDC issues the detailed procedure, after stakeholder consultation and Commission approval (p3).

Clause 6 introduces mandatory registration in NOAR, with a registration fee, a renewal charge and a fixed validity period (pp3–4). Clause 9 substitutes Regulation 8, replacing the old concurrence regime with an online 'standing clearance' regime: declarations on non-double-selling and metering infrastructure, verification of metering infrastructure and surplus corridor capacity, deadlines for issuing or refusing clearance, reminder messages and deemed grant where the RLDC/SLDC does not respond, a per-15-minute-block cap on scheduled quantum tied to the clearance, debarment for exceeding it, and revision of clearance for transmission constraints or grid security (pp4–6).

The remaining clauses route the whole short-term open access workflow through NOAR — application submission, acceptance and reasons, electronic bidding for congestion management, day-ahead and contingency scheduling, a new procedure for collective transactions from power exchanges, schedule revision, curtailment communication, online payment of all charges, and information publication, now an obligation of NOAR rather than RLDC/NLDC websites (pp6–9). A new proviso to Regulation 25A allows NLDC or the RLDC to deny short-term open access to a payer in default beyond a stated period without seeking Commission directions (p8). Commencement is deferred to a date to be separately notified (p1). The closing Note traces the Principal Regulations and the four earlier amendments plus a 2009 corrigendum, with gazette citations (pp9–10).

Standard name
Open Access Regulations
Primary topics
Open access, Scheduling and despatch, Power markets and exchanges

Read with this

The regulation

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.