Open Access Regulations, 2008 — Sixth Amendment — Commencement Notification, 2020

Notification - Open Access Regulations, 2008 (Sixth Amendment)

AmendmentDated 20 Mar 2020No. L-7/105(121)/2007-CERC dated 20th March, 2020

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Open Access in inter-State Transmission Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

One-page CERC notification dated 20 March 2020 (p1). It does not set substantive open-access rules; it fixes when the Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Sixth Amendment) Regulations, 2019 — called the "Amendment Regulations" — begin to operate (p1). The Commission notifies that they come into force with effect from 1 June 2020, or such other date as the Commission may notify (p1). The notification is issued in pursuance of Sub-Regulation 1.2 of Regulation 1 of those Amendment Regulations and is signed by the Secretary (p1). For an analyst, the document is a commencement bridge: the operative amendment text must be read elsewhere. It matters for the effective date of whatever the Sixth Amendment Regulations change in inter-State open access.

Standard name
Open Access Regulations
Primary topics
Open access

Read with this

The regulation

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document