Skip to content

CERC · Central Electricity Regulatory Commission

Open Access in Inter-State Transmission Regulations, 2008 — 2009 Amendment — Statement of Reasons

Central Electricity Regulatory Commission (Open Access in Inter-State Transmission) (Amendment) Regulations, 2009

Statement of reasonsDated 1 Jul 2009

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Open Access in inter-State Transmission Regulations, 2008 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 44 of 55. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's Statement of Reasons for the CERC (Open Access in Inter-State Transmission) (Amendment) Regulations, 2009. It records the history of inter-State open access regulation from the 2004 regulations through the 2008 regulations and explains why each proposed change was retained, modified or dropped after comments from stakeholders (p1–2). The amendments were originally intended to take effect from 1.4.2009, but commencement was revised so that the amended regulations apply to applications for open access received by nodal agencies on or after 15.6.2009 (p2–3).

The bulk of the document works through specific provisions of the 2008 regulations. It explains the revised definition of 'bilateral transaction' to cover transactions discovered at power exchanges through anonymous bidding (p3–6); the revised definition of 'detailed procedure' and its link to regulation 4 (p7); and the recast customer definitions, including 'long-term customer', a new 'medium-term customer', and 'short-term open access' / 'short-term customer', with omission of the old 'open access customer' (p7–10). It explains why the scope regulation is limited to short-term open access and why long-term and medium-term customers get priority (p10–11).

A large section deals with the State Load Despatch Centre's role in granting concurrence, 'no objection' or standing clearance: verification of metering and transmission capacity, timelines, defect communication, acknowledgement, refusal, and deemed concurrence supported by a notarised affidavit (p12–23). It then covers contingency scheduling through power exchange platforms (p23–24); the revised cancellation/downward revision regime for short-term schedules, including its application to pre-15.6.2009 customers (p24–27); the dropped proposal for daily revision of schedules (p27–33); curtailment priority in transmission constraints (p33–35); revised transmission charges and State-network charges (p35–41); the dropped revision fees (p42–43); restrictions on State utilities imposing other charges (p43–44); and the start of amendments to sharing of transmission charges among long-term customers (p44). It notes a corrigendum issued to remove an inadvertent phrase from regulation 8(4) (p23).

Standard name
Open Access Regulations
Primary topics
Open access, Scheduling and despatch, Transmission tariff

Read with this

The regulation

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document