Skip to content

CERC · Central Electricity Regulatory Commission

Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016

Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Fourth Amendment) Regulations, 2016

AmendmentDated 22 Jun 2016No.L-7/105(121)/2007-CERC dated 22.06.2016

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Open Access in inter-State Transmission Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fourth Amendment to CERC's 2008 Open Access in inter-State Transmission Regulations, issued by the Central Electricity Regulatory Commission on 22 June 2016 under section 178 of the Electricity Act, 2003 (p1). It has a single operative purpose: to replace Regulation 17 of the Principal Regulations in full with a new set of operating-charge provisions (p1–2).

The substituted Regulation 17 sets out how despatch-centre operating charges are levied and collected. For bilateral transactions the applicant pays Rs 1000/- per day or part of a day to each RLDC and each SLDC involved (p1). For collective transactions through power exchanges, NLDC charges are payable by each successful buyer and seller on the basis of energy scheduled at the regional periphery — Re 1/MWh, capped at Rs 200 per day per participant — with the exchanges required to collect the charges and remit them to NLDC daily and to give NLDC a daily list of successful participants, volumes cleared and charges levied (p1–2). Successful buyers and sellers also pay Rs 1000/- per day for the SLDC involved for each point of the collective transaction, and each point of injection or drawal in the State network is counted separately for SLDC charges and intra-State transmission charges (p2).

Commencement is from the date of publication in the Official Gazette; that Gazette date is not printed in the text (p1). A closing Note traces the amendment history of the Principal Regulations from 2008 through the 2009 amendment and corrigendum and the 2013 and 2015 amendments (pp2–3).

Standard name
Open Access Regulations
Primary topics
SLDC and RLDC fees and charges, Open access, Power markets and exchanges

Read with this

The regulation

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document