CERC · Central Electricity Regulatory Commission
Open Access in inter-State Transmission Regulations, 2008 — Second Amendment, 2013
Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Second Amendment) Regulations, 2013
Amendment · Gazette copyDated 11 Sep 2013Published in the Gazette 11 Sep 2013No.L-7/105(121)/2007-CERC. dated 11th September, 2013
Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Open Access in inter-State Transmission (Second Amendment) Regulations, 2013.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a CERC notification published in the Gazette of India Extraordinary of 11 September 2013 (p1), amending the Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations, 2008 — the "Principal Regulations" (p9). It is the Second Amendment to those regulations and takes effect from the date of Gazette publication (p9).
The amendment rewrites the operative machinery of short-term inter-State open access. It adds a definition of "intra-day transaction/contingency transaction" and redefines "intra-State entity" by reference to who does its metering, accounting and despatch (p9). Regulation 8 is heavily reworked: the SLDC-issued "No Objection" / "Prior Standing Clearance" becomes non-exchange-specific and is capped by an aggregate MW limit stated in the clearance; a new clause 2A governs use of that clearance for day-ahead collective transactions and bilateral intra-day/contingency transactions, with provisos on time-block quantum limits, clearance validity windows, and a Commission power to debar an entity from the power market for seven days after a hearing for quantum/time violations (p10). Concurrence applications must now be supported by a notarised affidavit that a valid contract exists and the same power is not contracted twice; SLDC must respond within three working days, and a deemed-concurrence route is set out requiring affidavits and documents to RLDC, power exchange, NLDC and SLDC on stated timelines (p10–12).
Regulation 14 now routes forced-outage scheduling of short-term bilateral transactions to Grid Code Regulation 6.5 and re-specifies operating charges on downward revision or cancellation (p12). Regulation 16 is substituted: transmission charges follow the Sharing of Inter-State Transmission Charges and Losses Regulations, 2010, intra-State entities pay State-network charges fixed by their State Commission, a default rate applies where none is fixed, non-fixation is not a ground to refuse open access, and charges cannot be revised retrospectively (p12–13). Regulation 23 (transmission losses) and Regulation 25 (collection and disbursement of transmission charges, split between nodal agency, CTU, power exchanges and SLDCs) are substituted (p13–14). Regulation 25A is replaced with a bar on granting short-term access to entities and their associates who consistently default on deviation charges, transmission charges, reactive energy charges, congestion charges and NLDC/RLDC fees (p14). Regulations 20, 21, 22 and 27 are adjusted: "State utility" becomes "State agency" or "State Transmission Utility" in places, deviation charges are routed to the 2009 UI Regulations, and Special Energy Meter installation responsibility is fixed (p13–15). A closing note recites the 2008 principal publication and the 2009 amendment and corrigendum (p15).
Read with this
The regulation
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
Amendments and corrections
- Dated 20 May 2009Open Access in inter-State Transmission (Amendment) Regulations, 2009
- Dated 10 Jun 2009Open Access in inter-State Transmission Regulations, 2008 — Corrigendum, 2009
- Dated 10 Jun 2009Open Access (Amendment) Regulations, 2009 — Corrigenda
- Dated 11 Sep 2013Open Access in inter-State Transmission (Second Amendment) Regulations, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020Open Access Regulations, 2008 — Sixth Amendment — Commencement Notification, 2020
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 4 Mar 2008Open Access in Inter-State Transmission System Regulations, 2008 — Statement of Reasons
- Dated 1 Jul 2009Open Access in Inter-State Transmission Regulations, 2008 — 2009 Amendment — Statement of Reasons
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015 — Statement of Objects and Reasons
- Dated 12 Jul 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016 — Statement of Objects and Reasons
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 21 Mar 2022Notification — effective date 01.05.2022
- Dated 21 Mar 2022Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Commencement Notification
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 1 Apr 2022Approval of Procedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
- Dated 1 Apr 2022Short Term Open Access in Inter-State Transmission through NOAR — Procedure, 2022
- Dated 6 May 2022Corrigendum to the NOAR STOA Procedure Order, 2022
- Date not statedProcedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
Other copies of these documents (5)
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019
Earlier drafts
- Dated 3 Jul 2014Open Access in inter-State Transmission Regulations, 2008 — Third Amendment, 2014 — Draft
- Dated 3 Jul 2014Public notice: Open Access in inter-State Transmission (Third Amendment) Regulations, 2014 — Public Notice — Draft
- Released with the notice dated 3 Jul 2014Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Third Amendment, 2014 — Explanatory Memorandum — Draft
- Dated 3 May 2016Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Draft
- Dated 3 May 2016Public notice: Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 3 May 2016Explanatory memorandum: Open Access in Inter-state Transmission (Fourth Amendment) Regulations, 2016 — Explanatory Memorandum — Draft
- Dated 8 Aug 2018Open Access in inter-State Transmission Regulations, 2008 — Fifth Amendment, 2018 — Draft
- Released with the notice dated 8 Aug 2018Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Fifth Amendment — Draft Explanatory Memorandum
- Dated 8 Aug 2018Public notice: Draft Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Public Notice
- Dated 6 Aug 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.