Skip to content

CERC · Central Electricity Regulatory Commission

Open Access in inter-State Transmission Regulations, 2008 — Second Amendment, 2013

Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Second Amendment) Regulations, 2013

Amendment · Gazette copyDated 11 Sep 2013Published in the Gazette 11 Sep 2013No.L-7/105(121)/2007-CERC. dated 11th September, 2013

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Open Access in inter-State Transmission (Second Amendment) Regulations, 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC notification published in the Gazette of India Extraordinary of 11 September 2013 (p1), amending the Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations, 2008 — the "Principal Regulations" (p9). It is the Second Amendment to those regulations and takes effect from the date of Gazette publication (p9).

The amendment rewrites the operative machinery of short-term inter-State open access. It adds a definition of "intra-day transaction/contingency transaction" and redefines "intra-State entity" by reference to who does its metering, accounting and despatch (p9). Regulation 8 is heavily reworked: the SLDC-issued "No Objection" / "Prior Standing Clearance" becomes non-exchange-specific and is capped by an aggregate MW limit stated in the clearance; a new clause 2A governs use of that clearance for day-ahead collective transactions and bilateral intra-day/contingency transactions, with provisos on time-block quantum limits, clearance validity windows, and a Commission power to debar an entity from the power market for seven days after a hearing for quantum/time violations (p10). Concurrence applications must now be supported by a notarised affidavit that a valid contract exists and the same power is not contracted twice; SLDC must respond within three working days, and a deemed-concurrence route is set out requiring affidavits and documents to RLDC, power exchange, NLDC and SLDC on stated timelines (p10–12).

Regulation 14 now routes forced-outage scheduling of short-term bilateral transactions to Grid Code Regulation 6.5 and re-specifies operating charges on downward revision or cancellation (p12). Regulation 16 is substituted: transmission charges follow the Sharing of Inter-State Transmission Charges and Losses Regulations, 2010, intra-State entities pay State-network charges fixed by their State Commission, a default rate applies where none is fixed, non-fixation is not a ground to refuse open access, and charges cannot be revised retrospectively (p12–13). Regulation 23 (transmission losses) and Regulation 25 (collection and disbursement of transmission charges, split between nodal agency, CTU, power exchanges and SLDCs) are substituted (p13–14). Regulation 25A is replaced with a bar on granting short-term access to entities and their associates who consistently default on deviation charges, transmission charges, reactive energy charges, congestion charges and NLDC/RLDC fees (p14). Regulations 20, 21, 22 and 27 are adjusted: "State utility" becomes "State agency" or "State Transmission Utility" in places, deviation charges are routed to the 2009 UI Regulations, and Special Energy Meter installation responsibility is fixed (p13–15). A closing note recites the 2008 principal publication and the 2009 amendment and corrigendum (p15).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Scheduling and despatch

Read with this

The regulation

Other copies of these documents (5)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document