Open Access in inter-State Transmission (Amendment) Regulations, 2009

Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Amendment) Regulations, 2009

AmendmentDated 20 May 2009No.L-7/105(121)/2007-CERC dated 20th May 2009

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Open Access in inter-State Transmission Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC notification of 20 May 2009 that rewrites large parts of the Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations, 2008. It is framed under section 178 of the Electricity Act, 2003 and applies to short-term open access applications received by the nodal agency on or after 15 June 2009 (p1).

Clauses 2–5 rebuild the definitional and scope architecture: regulation 2 is recast to define bilateral transactions (including power-exchange transactions discovered by anonymous bidding), detailed procedure, long-term customer, medium-term customer, short-term open access and short-term customer; the old sub-clause on 'open access customer' is deleted, and throughout the principal regulations the bare expressions 'open access' and 'open access customer' are replaced by 'short-term open access' and 'short-term customer' respectively (p1–3). Regulation 3 is replaced with a scope clause giving long-term and medium-term customers priority over short-term customers on the inter-State transmission system, with short-term users confined to surplus capacity left after their use, including design margins and spare capacity for future growth (p3–4). Regulation 4 is replaced to place the detailed procedure with the Central Transmission Utility (and later the notified successor under section 27(2)), subject to prior Commission approval (p4).

Clauses 6–9 are the operational core. Regulation 8 is expanded into an SLDC concurrence/‘no objection’ regime with acknowledgement deadlines, verification of time-block metering infrastructure and surplus State-network capacity, decision deadlines, a new deficiency-communication clause (3A), and a deemed-grant provision where the SLDC fails to respond in time — supported by a notarised affidavit and evidence of application (p4–8). Regulation 13 is replaced with a contingency scheduling window allowing a buyer, trader or the power exchange to locate power after the 1500 hrs cut-off of the preceding day, with the nodal agency to accommodate requests so far as feasible (p8). Regulation 14 is replaced with a cancellation/downward-revision procedure requiring a minimum two-day notice period and continued payment of transmission and operating charges, and its Note expressly extends these provisions to short-term customers granted access before 15 June 2009 (p8–9). Regulation 15 gives RLDCs curtailment powers with a stated order of curtailment across short-term, medium-term and long-term transactions, and within short-term, bilateral before collective (p9–10).

Clauses 10–16 deal with money and governance: regulation 16 is replaced with a transmission-charge structure distinguishing intra-regional and adjacent-region bilateral transactions and collective transactions, with State-network charges to be fixed by the State Commission, a fallback rate where no State charges are determined, non-fixation not being grounds for refusal, web display, and a bar on retrospective revision (p10–11); regulation 20(6) bars any charges beyond those specified (p12); regulation 25 is replaced with a collection and disbursement mechanism through the nodal agency, splitting receipts between the CTU and long-term customers and allocating shares across regions (p12–13); a new regulation 25A lets the Commission direct NLDC/RLDC to refuse short-term open access to entities and their associates who consistently and wilfully default on specified charges (p14); regulation 26 is replaced with a simple redressal mechanism — disputes decided by the Commission on application by the aggrieved person (p14); and regulation 27's title is amended, with a new regulation 27A requiring each SLDC to build a website and publish specified inter-State open access information within 60 days of commencement (p14–15).

The document is not self-contained: it operates entirely by substitution into the 2008 principal regulations, so its practical effect must be read there.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Scheduling and despatch

Read with this

The regulation

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document