CERC · Central Electricity Regulatory Commission
Open Access in inter-State Transmission (Amendment) Regulations, 2009
Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Amendment) Regulations, 2009
AmendmentDated 20 May 2009No.L-7/105(121)/2007-CERC dated 20th May 2009
Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Open Access in inter-State Transmission Regulations, 2008.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a CERC notification of 20 May 2009 that rewrites large parts of the Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations, 2008. It is framed under section 178 of the Electricity Act, 2003 and applies to short-term open access applications received by the nodal agency on or after 15 June 2009 (p1).
Clauses 2–5 rebuild the definitional and scope architecture: regulation 2 is recast to define bilateral transactions (including power-exchange transactions discovered by anonymous bidding), detailed procedure, long-term customer, medium-term customer, short-term open access and short-term customer; the old sub-clause on 'open access customer' is deleted, and throughout the principal regulations the bare expressions 'open access' and 'open access customer' are replaced by 'short-term open access' and 'short-term customer' respectively (p1–3). Regulation 3 is replaced with a scope clause giving long-term and medium-term customers priority over short-term customers on the inter-State transmission system, with short-term users confined to surplus capacity left after their use, including design margins and spare capacity for future growth (p3–4). Regulation 4 is replaced to place the detailed procedure with the Central Transmission Utility (and later the notified successor under section 27(2)), subject to prior Commission approval (p4).
Clauses 6–9 are the operational core. Regulation 8 is expanded into an SLDC concurrence/‘no objection’ regime with acknowledgement deadlines, verification of time-block metering infrastructure and surplus State-network capacity, decision deadlines, a new deficiency-communication clause (3A), and a deemed-grant provision where the SLDC fails to respond in time — supported by a notarised affidavit and evidence of application (p4–8). Regulation 13 is replaced with a contingency scheduling window allowing a buyer, trader or the power exchange to locate power after the 1500 hrs cut-off of the preceding day, with the nodal agency to accommodate requests so far as feasible (p8). Regulation 14 is replaced with a cancellation/downward-revision procedure requiring a minimum two-day notice period and continued payment of transmission and operating charges, and its Note expressly extends these provisions to short-term customers granted access before 15 June 2009 (p8–9). Regulation 15 gives RLDCs curtailment powers with a stated order of curtailment across short-term, medium-term and long-term transactions, and within short-term, bilateral before collective (p9–10).
Clauses 10–16 deal with money and governance: regulation 16 is replaced with a transmission-charge structure distinguishing intra-regional and adjacent-region bilateral transactions and collective transactions, with State-network charges to be fixed by the State Commission, a fallback rate where no State charges are determined, non-fixation not being grounds for refusal, web display, and a bar on retrospective revision (p10–11); regulation 20(6) bars any charges beyond those specified (p12); regulation 25 is replaced with a collection and disbursement mechanism through the nodal agency, splitting receipts between the CTU and long-term customers and allocating shares across regions (p12–13); a new regulation 25A lets the Commission direct NLDC/RLDC to refuse short-term open access to entities and their associates who consistently and wilfully default on specified charges (p14); regulation 26 is replaced with a simple redressal mechanism — disputes decided by the Commission on application by the aggrieved person (p14); and regulation 27's title is amended, with a new regulation 27A requiring each SLDC to build a website and publish specified inter-State open access information within 60 days of commencement (p14–15).
The document is not self-contained: it operates entirely by substitution into the 2008 principal regulations, so its practical effect must be read there.
Read with this
The regulation
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
Amendments and corrections
- Dated 10 Jun 2009Open Access in inter-State Transmission Regulations, 2008 — Corrigendum, 2009
- Dated 10 Jun 2009Open Access (Amendment) Regulations, 2009 — Corrigenda
- Dated 11 Sep 2013Open Access in inter-State Transmission (Second Amendment) Regulations, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020Open Access Regulations, 2008 — Sixth Amendment — Commencement Notification, 2020
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 4 Mar 2008Open Access in Inter-State Transmission System Regulations, 2008 — Statement of Reasons
- Dated 1 Jul 2009Open Access in Inter-State Transmission Regulations, 2008 — 2009 Amendment — Statement of Reasons
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015 — Statement of Objects and Reasons
- Dated 12 Jul 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016 — Statement of Objects and Reasons
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 21 Mar 2022Notification — effective date 01.05.2022
- Dated 21 Mar 2022Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Commencement Notification
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 1 Apr 2022Approval of Procedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
- Dated 1 Apr 2022Short Term Open Access in Inter-State Transmission through NOAR — Procedure, 2022
- Dated 6 May 2022Corrigendum to the NOAR STOA Procedure Order, 2022
- Date not statedProcedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
Other copies of these documents (6)
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
- Dated 11 Sep 2013Open Access in inter-State Transmission Regulations, 2008 — Second Amendment, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019
Earlier drafts
- Dated 3 Jul 2014Open Access in inter-State Transmission Regulations, 2008 — Third Amendment, 2014 — Draft
- Dated 3 Jul 2014Public notice: Open Access in inter-State Transmission (Third Amendment) Regulations, 2014 — Public Notice — Draft
- Released with the notice dated 3 Jul 2014Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Third Amendment, 2014 — Explanatory Memorandum — Draft
- Dated 3 May 2016Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Draft
- Dated 3 May 2016Public notice: Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 3 May 2016Explanatory memorandum: Open Access in Inter-state Transmission (Fourth Amendment) Regulations, 2016 — Explanatory Memorandum — Draft
- Dated 8 Aug 2018Open Access in inter-State Transmission Regulations, 2008 — Fifth Amendment, 2018 — Draft
- Released with the notice dated 8 Aug 2018Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Fifth Amendment — Draft Explanatory Memorandum
- Dated 8 Aug 2018Public notice: Draft Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Public Notice
- Dated 6 Aug 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.