Skip to content

CERC · Central Electricity Regulatory Commission

Open Access in inter-State Transmission (Third Amendment) Regulations, 2015

Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Third Amendment) Regulations, 2015

Amendment · Gazette copyDated 12 May 2015Published in the Gazette 15 May 2015No.L-7/105(121)/2007-CERC.- dated 12th May, 2015

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Open Access in inter-State Transmission (Third Amendment) Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's Third Amendment to its 2008 Open Access in inter-State Transmission Regulations, notified on 12 May 2015 and published in the Gazette of India on 15 May 2015 (p1, p3). It takes effect from the date of Gazette publication (p3).

Clause 2 adds two definitions to Regulation 2 of the Principal Regulations. NLDC and RLDC operating charges are defined to include fees for scheduling, system operation, and collection and disbursement of charges for short-term open access inter-State transactions, and are expressed as being in addition to the fees and charges the Commission specifies under s.28(4) of the Act. SLDC operating charges are defined the same way, additional to State Commission charges under s.32(3), and are made applicable to inter-State short-term customers only where the State Commission has not notified its own operating charges (p3).

Clause 3 substitutes provisos to Regulation 8(3)(a): an applicant seeking concurrence for a bilateral transaction — other than an intra-day or contingency transaction — must file a notarised affidavit, in the format set out in the Detailed Procedure, declaring that a valid contract exists and that no other contract covers the same power; the same declaration is required for collective transactions seeking SLDC no-objection or prior standing clearance (p3–4). It also corrects a cross-reference in the 2013 Second Amendment from "b (iii)" to "b (ii)" (p4).

Clause 4 substitutes Regulation 17(1) and (2), fixing the per-day operating charges payable by applicants to each RLDC and SLDC involved in a bilateral transaction and by power exchanges to NLDC and SLDCs for collective transactions — ₹1000 per day per RLDC/SLDC, and ₹2000 per day to NLDC for each State involved in a collective transaction (p4).

A Note on page 4 records the amendment history of the Principal Regulations.

Standard name
Open Access Regulations
Primary topics
Open access, SLDC and RLDC fees and charges

Read with this

The regulation

Other copies of these documents (5)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document