Framework for Real-Time Market for Electricity

Statement of reasonsDate not stated

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Open Access in inter-State Transmission Regulations, 2008 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

`Framework for Real-Time Market for Electricity — Statement of Reasons` is CERC's explanation of its decisions on introducing a Real-Time Market (RTM) for electricity. It follows the explanatory memorandum and draft amendments to the Indian Electricity Grid Code, Power Market Regulations and Open Access in inter-State Transmission Regulations issued on 06.08.2019, comments due 05.09.2019, 32 written submissions, and a public hearing on 14.10.2019 (p1; Annexure I pp38–39).

Section 2 deals with the right to revision of schedule. The Commission retains the proposed 7th/8th time-block revision for ISGS entitlement and forced outages under long/medium/short-term bilateral transactions, excluding collective transactions in the day-ahead and real-time markets, but keeps the existing 4-time-block revision for wind and solar generators and the system operator (p2–9). Section 3 sets the half-hourly timeline and gate closure: bids open from 22:45 to 23:00 for delivery of the first two 15-minute blocks, with clearing and scheduling later; the Commission keeps the proposed timeline and directs power exchanges to develop the market engine (p9–13).

Section 4 covers transmission capacity and curtailment. In extreme curtailment, day-ahead collective transactions are curtailed before real-time collective transactions; corridor allocation between power exchanges continues on the day-ahead cleared-volume ratio, subject to a minimum 10% to the smaller exchange, or later Commission order (p14–16). Section 5 sets profit sharing: section 62 generators share net gains with discoms 50:50 subject to a ceiling of 7 paise/kWh to the generator; discoms selling their own share retain all gains; section 63 may need a supplementary PPA (p16–20). Sections 6–10 address capacity building, auction design and price discovery, NOC, charges, and other implementation issues, including uniform-price double-sided auction, deferred buy-back for all generators, single NOC, and directives to POSOCO/NLDC and power exchanges on procedures and market rules (p20–34). Section 11 makes editorial and consequential changes in the Open Access and Power Market Regulations, and sections 12–13 record market-monitoring comments and confirm the final amendments (p34–37). RTM is to be implemented from 1 April 2020, with mock exercises coordinated by POSOCO (p7, p21).

Standard name
Grid Code, Open Access Regulations, Power Market Regulations
Primary topics
Power markets and exchanges, Scheduling and despatch, Congestion and curtailment

Read with this

Read with this: Open Access in inter-State Transmission Regulations, 2008

The regulation

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

It is also read with: Indian Electricity Grid Code Regulations, 2010

Replaced by Indian Electricity Grid Code Regulations, 2023 · The commission's reasons for the Indian Electricity Grid Code Regulations, 2010 or one of its amendments. See that regulation for the date it took effect and for anything it keeps in force.

The regulation

Other copies of these documents (9)

3 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document