Skip to content

CERC · Central Electricity Regulatory Commission

Open Access in inter-State Transmission Regulations, 2008

Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations, 2008

Regulation · Gazette copyDated 25 Jan 2008Published in the Gazette 7 Feb 2008No. L-7/105(121)/2007-CERC. dated 25th January, 2008

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Open Access in inter-State Transmission Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations, 2008 are the Commission's principal framework for granting and scheduling open access on the inter-State transmission system. Notified on 25 January 2008 and published in the Gazette of India on 7 February 2008 (p1, p13), they apply to applications for energy transfer schedules commencing on or after 1 April 2008 (p13), from which date the short-term open access regime of the 2004 regulations is repealed (p39).

Regulations 1–5 (pp13–16) carry the title, application and definitions, then set scope and institutions. Long-term customers keep first priority over the inter-State transmission system for designated use; the regulations govern use of the surplus capacity left over from inherent design margins, flow variation and spare capacity built for future load growth. The Central Transmission Utility is to issue a detailed procedure, with the Commission's approval, for residual matters; the RLDC is nodal agency for bilateral transactions and the NLDC for collective ones.

Regulations 6–14 (pp16–29) lay out the application and scheduling machinery: what an application must contain, a non-refundable application fee, SLDC concurrence or no-objection/standing clearance for State utilities and intra-State entities, advance scheduling windows running from the second to the fourth month ahead, electronic bidding where applications would congest a corridor, first-come-first-served scheduling for nearer slots, day-ahead clubbing with collective transactions, contingency scheduling after cut-off, and rules for revising or cancelling accepted schedules with notice and the resulting charge liability.

Regulations 15–25 (pp30–38) cover curtailment for transmission constraints or grid security, transmission and operating charges and their payment and default consequences, UI accounting for State utilities and intra-State entities, reactive energy, special energy meters, transmission losses, compliance with the Grid Code, and how collected charges are retained by the CTU and shared with regions to reduce long-term customers' monthly transmission charges.

Regulations 26–28 (pp38–39) provide the dispute forum (the Commission, or the State Commission for SLDC/intra-State matters), mandatory website disclosure of open access information, and the savings and repeal of the 2004 regulations.

Standard name
Open Access Regulations
Primary topics
Open access, Scheduling and despatch, Open access charges

Read with this

The regulation

Other copies of these documents (5)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document