Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019

Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Sixth Amendment) Regulations, 2019

Amendment · Gazette copyDated 12 Dec 2019No. L-7/105(121)/2007-CERC dated 12th December, 2019

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Open Access in inter-State Transmission (Sixth Amendment) Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Gazette notification of the Central Electricity Regulatory Commission issued in New Delhi on 12 December 2019 (p3), making the Sixth Amendment to the CERC (Open Access in inter-State Transmission) Regulations, 2008. It is textually short but substantively significant: it is the instrument that inserts the real-time market into the inter-State open access framework.

The amendment alters four provisions of the Principal Regulations. Regulation 2 gets a substituted definition of 'Intra-Day Transaction/Contingency Transaction' and a new definition of 'Real-time transactions', both framed around after-the-fact scheduling by the RLDC or NLDC (p4). Regulation 13 gains a new clause 13(B) laying down the procedure for scheduling real-time market transactions — bidding on power exchanges, the trade window, double-sided closed-bid auction per time block, corridor availability intimated by the Nodal Agency, clearing by exchanges, submission of cleared bids for scheduling, and announcement of the final schedule — followed by an illustration table timing the auction, clearing, communication and despatch cycle (p4–5). A proviso is added to Regulation 15(1) setting an order of curtailment as between day-ahead and real-time transactions (p5). Regulation 20(1) is substituted to require that transactions scheduled by the nodal agency, after accounting for post-real-time-market schedule changes, be included in the day-ahead net interchange schedules of the regional entity (p5).

The regulations commence on 1 April 2020 or such other date as the Commission may notify (p4). A closing Note traces the amendment history of the Principal Regulations from 2008 through five earlier amendments and a corrigendum (p5–6).

Standard name
Open Access Regulations
Primary topics
Open access, Power markets and exchanges, Scheduling and despatch

Read with this

The regulation

Other copies of these documents (5)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document