Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Third Amendment) Regulations, 2014

Draft amendmentDated 3 Jul 2014No.L-7/105(121)/2007-CERC dated 3rd July, 2014

Draft

A proposal that has since been finalised as the Open Access in inter-State Transmission (Third Amendment) Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft of CERC's Third Amendment to the Open Access in inter-State Transmission Regulations, 2008, issued for comment on 3 July 2014 (p1). It does four things.

Regulation 2 inserts two new definitions into Regulation 2(1) of the principal regulations — 'NLDC/RLDC operating charges' and 'SLDC operating charges' — each covering the fees for scheduling, system operation and collection and disbursement of charges for short-term open access transactions. Provisos keep these charges additional to the fees the Commission specifies under s.28(4) and those State Commissions specify under s.32(3), and make the Commission-decided SLDC charges applicable to inter-State short-term customers only where the State Commission has not notified its own (p1–2).

Regulation 3 rewrites the second and third provisos to Regulation 8(3)(a): an applicant seeking SLDC concurrence for a bilateral transaction (other than intra-day or contingency) must file a notarised affidavit declaring a valid contract and no other contract for the same power, and the same no-other-contract declaration must accompany a no-objection or prior standing clearance application for collective transactions. It also corrects a clause cross-reference in the 2013 Second Amendment Regulations (p2–3).

Regulation 4 substitutes Regulation 17 wholesale: who pays RLDC, NLDC and SLDC operating charges in bilateral and collective transactions, the energy-scheduled basis and the periphery at which it is measured, daily transfer of NLDC charges collected by power exchanges, separate counting of each injection or drawal point, and the leaving of rates and a daily maximum ceiling to later Commission orders, with calculation per the Annexure (p3–4). The Annexure works through bilateral and collective examples (p5–7).

Standard name
Open Access Regulations
Primary topics
Open access, SLDC and RLDC fees and charges

Read with this

The regulation

Other copies of these documents (6)

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.