CERC · Central Electricity Regulatory Commission
Open Access in inter-State Transmission Regulations, 2008 — Third Amendment, 2014 — Draft
Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Third Amendment) Regulations, 2014
Draft amendmentDated 3 Jul 2014No.L-7/105(121)/2007-CERC dated 3rd July, 2014
Draft
A proposal that has since been finalised as the Open Access in inter-State Transmission (Third Amendment) Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft of CERC's Third Amendment to the Open Access in inter-State Transmission Regulations, 2008, issued for comment on 3 July 2014 (p1). It does four things.
Regulation 2 inserts two new definitions into Regulation 2(1) of the principal regulations — 'NLDC/RLDC operating charges' and 'SLDC operating charges' — each covering the fees for scheduling, system operation and collection and disbursement of charges for short-term open access transactions. Provisos keep these charges additional to the fees the Commission specifies under s.28(4) and those State Commissions specify under s.32(3), and make the Commission-decided SLDC charges applicable to inter-State short-term customers only where the State Commission has not notified its own (p1–2).
Regulation 3 rewrites the second and third provisos to Regulation 8(3)(a): an applicant seeking SLDC concurrence for a bilateral transaction (other than intra-day or contingency) must file a notarised affidavit declaring a valid contract and no other contract for the same power, and the same no-other-contract declaration must accompany a no-objection or prior standing clearance application for collective transactions. It also corrects a clause cross-reference in the 2013 Second Amendment Regulations (p2–3).
Regulation 4 substitutes Regulation 17 wholesale: who pays RLDC, NLDC and SLDC operating charges in bilateral and collective transactions, the energy-scheduled basis and the periphery at which it is measured, daily transfer of NLDC charges collected by power exchanges, separate counting of each injection or drawal point, and the leaving of rates and a daily maximum ceiling to later Commission orders, with calculation per the Annexure (p3–4). The Annexure works through bilateral and collective examples (p5–7).
Read with this
The regulation
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
Amendments and corrections
- Dated 20 May 2009Open Access in inter-State Transmission (Amendment) Regulations, 2009
- Dated 10 Jun 2009Open Access in inter-State Transmission Regulations, 2008 — Corrigendum, 2009
- Dated 10 Jun 2009Open Access (Amendment) Regulations, 2009 — Corrigenda
- Dated 11 Sep 2013Open Access in inter-State Transmission (Second Amendment) Regulations, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020Open Access Regulations, 2008 — Sixth Amendment — Commencement Notification, 2020
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 4 Mar 2008Open Access in Inter-State Transmission System Regulations, 2008 — Statement of Reasons
- Dated 1 Jul 2009Open Access in Inter-State Transmission Regulations, 2008 — 2009 Amendment — Statement of Reasons
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015 — Statement of Objects and Reasons
- Dated 12 Jul 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016 — Statement of Objects and Reasons
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 21 Mar 2022Notification — effective date 01.05.2022
- Dated 21 Mar 2022Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Commencement Notification
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 1 Apr 2022Approval of Procedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
- Dated 1 Apr 2022Short Term Open Access in Inter-State Transmission through NOAR — Procedure, 2022
- Dated 6 May 2022Corrigendum to the NOAR STOA Procedure Order, 2022
- Date not statedProcedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
Other copies of these documents (6)
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
- Dated 11 Sep 2013Open Access in inter-State Transmission Regulations, 2008 — Second Amendment, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019
Earlier drafts
- Dated 3 May 2016Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Draft
- Dated 3 May 2016Public notice: Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 3 May 2016Explanatory memorandum: Open Access in Inter-state Transmission (Fourth Amendment) Regulations, 2016 — Explanatory Memorandum — Draft
- Dated 8 Aug 2018Open Access in inter-State Transmission Regulations, 2008 — Fifth Amendment, 2018 — Draft
- Released with the notice dated 8 Aug 2018Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Fifth Amendment — Draft Explanatory Memorandum
- Dated 8 Aug 2018Public notice: Draft Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Public Notice
- Dated 6 Aug 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
- Dated 3 Jul 2014Public notice: Open Access in inter-State Transmission (Third Amendment) Regulations, 2014 — Public Notice — Draft
- Released with the notice dated 3 Jul 2014Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Third Amendment, 2014 — Explanatory Memorandum — Draft
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.