Skip to content

CERC · Central Electricity Regulatory Commission

Open Access in inter-State Transmission Regulations, 2008 — Corrigendum, 2009

Corrigendum (10-07-2009)

CorrigendumDated 10 Jun 2009No. L-7/105(121)/2007-CERC dated the 10th June, 2009

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Corrects the Open Access in inter-State Transmission Regulations, 2008 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page corrigendum issued by the Central Electricity Regulation Commission on 10 June 2009 (p1). It makes two drafting corrections to the CERC (Open Access in inter-State Transmission) Regulations, 2008 as already amended by the 2009 Amendment Regulations (p1).

The first correction deletes the cross-reference "under clause (1) of regulation 9" from the second proviso to regulation 8(4). The second substitutes the phrase "a State utility" for "an inter-State entity" in regulation 25(6) (p1). Nothing else in the 2008 Regulations is touched.

The closing Notes record where the two underlying instruments were gazetted — the principal 2008 Regulations on 7.2.2008 and the 2009 Amendment Regulations on 29.5.2009 (p1). No gazette date or commencement date is printed for the corrigendum itself, and the text does not restate who the corrected provisions bind.

Standard name
Open Access Regulations
Primary topics
Open access

Read with this

The regulation

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document