Skip to content

CERC · Central Electricity Regulatory Commission

Approval of Procedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022

Approval of "Procedure for Short Term Open Access in inter-State Transmission System through National Open Access Registry (NOAR)" under Regulation 4 of the Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Fifth Amendment) Regulations, 2018

OrderDated 1 Apr 2022No.-L-7/105(121)/2007-CERC dated 1 st April 2022

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Open Access in inter-State Transmission Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page CERC order (p1–2) approving the "Procedure for Short Term Open Access in inter-State Transmission System through National Open Access Registry (NOAR)".

It records that the CERC (Open Access in inter-State Transmission) (Fifth Amendment) Regulations, 2018, notified on 2 January 2019, require NLDC to issue the detailed procedure to operationalise open access through NOAR — including residual matters not covered by those regulations — after stakeholder consultation and with the Commission's approval (p1). NLDC submitted the procedure by letters of 12 July 2019 and 17 May 2021 (p2).

The Commission examined the submission, made suitable changes, and approved the procedure. The procedure takes effect from the coming into effect of the Fifth Amendment Regulations 2018, not from the order date (p2). Paragraphs 1–4 are recitals and the approval; paragraph 5 is the only operative timing clause.

Standard name
Open Access Regulations
Primary topics
Open access

Read with this

The regulation

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document