CERC · Central Electricity Regulatory Commission
Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Fifth Amendment) Regulations, 2018
Amendment · Gazette copyDated 2 Jan 2019No. PM/NOAR/2016/CERC. dated 2nd January, 2019
Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fifth Amendment to CERC's 2008 inter-State open access regulations, issued as Notification No. PM/NOAR/2016/CERC and dated 2 January 2019 (p7). Its organising idea is a single new electronic platform — the National Open Access Registry (NOAR) — through which short-term open access in inter-State transmission is to be applied for, cleared, scheduled, paid for and reported on. Importantly, the amendment does not start running on its own: clause 1.2 defers commencement to a date to be separately notified by the Commission (p7).
The amendment first inserts a definition of NOAR into Regulation 2 and then adds a wholly new Regulation 3A (pp7–9). That regulation describes NOAR as the common electronic platform for short-term open access: automating administration, giving a single window for short-term customers, trading licensees, Power Exchanges, NLDC, RLDCs, SLDCs and Regional Power Committees, keeping an audit trail and dashboard of applications approved, rejected or pending, acting as an information repository, interfacing with RLDC/SLDC application software and with Power Exchanges, and offering a payment gateway. It names NLDC as the nodal agency for implementation and operation, charges it with cyber-security compliance, disaster recovery and periodic review, and provides for the added cost to be recovered through the separate CERC fees-and-charges regulations for RLDCs (p9).
Regulation 4 is replaced so that NLDC, after stakeholder consultation and Commission approval, issues the detailed procedure to operationalise NOAR (p9). New Regulations 5A and 5B route processing of bilateral and collective short-term applications through NOAR and set up a registration regime for applicants, with a registration fee, a processing deadline, a fixed validity period and a renewal charge (pp9–10). Regulation 6 and later clauses simply redirect the existing steps — applications, advance scheduling, congestion-management bidding, revisions, curtailment notices and reasons for refusal — through NOAR (pp10–14).
The most substantive rewrite is Regulation 8, now recast around 'standing clearance' issued by the concerned RLDC or SLDC: what the online application must declare, what the despatcher must verify, the time limits for grant, refusal and deficiency notices, the validity of clearance, and a deemed-grant provision where the despatcher does not respond to a NOAR reminder within the next two working days (pp10–12). It also caps aggregate bid quantum per 15-minute block at the standing clearance and provides for debarment from the short-term market for overdrawal of quantum, with a public list of debarred customers on NOAR (pp11–12). A new Regulation 13A covers scheduling of collective transactions by Power Exchanges (p13); a new Regulation 18A makes all payments online through the NOAR gateway (p13); and a new proviso to Regulation 25A lets NLDC or the RLDC deny short-term open access to a defaulting entity without a Commission direction once payment default exceeds a stated period (pp13–14). Finally, Regulation 27 is retitled and rewritten so that open access information is published by NOAR rather than on despatcher websites, and the 'concurrence / no objection / prior standing clearance' vocabulary is replaced by 'standing clearance' throughout (p14). The closing Note lists the principal regulations and the earlier amendments in the chain (pp14–15).
Read with this
The regulation
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
Amendments and corrections
- Dated 20 May 2009Open Access in inter-State Transmission (Amendment) Regulations, 2009
- Dated 10 Jun 2009Open Access in inter-State Transmission Regulations, 2008 — Corrigendum, 2009
- Dated 10 Jun 2009Open Access (Amendment) Regulations, 2009 — Corrigenda
- Dated 11 Sep 2013Open Access in inter-State Transmission (Second Amendment) Regulations, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020Open Access Regulations, 2008 — Sixth Amendment — Commencement Notification, 2020
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 4 Mar 2008Open Access in Inter-State Transmission System Regulations, 2008 — Statement of Reasons
- Dated 1 Jul 2009Open Access in Inter-State Transmission Regulations, 2008 — 2009 Amendment — Statement of Reasons
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015 — Statement of Objects and Reasons
- Dated 12 Jul 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016 — Statement of Objects and Reasons
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 21 Mar 2022Notification — effective date 01.05.2022
- Dated 21 Mar 2022Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Commencement Notification
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 1 Apr 2022Approval of Procedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
- Dated 1 Apr 2022Short Term Open Access in Inter-State Transmission through NOAR — Procedure, 2022
- Dated 6 May 2022Corrigendum to the NOAR STOA Procedure Order, 2022
- Date not statedProcedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
Other copies of these documents (5)
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
- Dated 11 Sep 2013Open Access in inter-State Transmission Regulations, 2008 — Second Amendment, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 12 Dec 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019
Earlier drafts
- Dated 3 Jul 2014Open Access in inter-State Transmission Regulations, 2008 — Third Amendment, 2014 — Draft
- Dated 3 Jul 2014Public notice: Open Access in inter-State Transmission (Third Amendment) Regulations, 2014 — Public Notice — Draft
- Released with the notice dated 3 Jul 2014Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Third Amendment, 2014 — Explanatory Memorandum — Draft
- Dated 3 May 2016Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Draft
- Dated 3 May 2016Public notice: Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 3 May 2016Explanatory memorandum: Open Access in Inter-state Transmission (Fourth Amendment) Regulations, 2016 — Explanatory Memorandum — Draft
- Dated 8 Aug 2018Open Access in inter-State Transmission Regulations, 2008 — Fifth Amendment, 2018 — Draft
- Released with the notice dated 8 Aug 2018Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Fifth Amendment — Draft Explanatory Memorandum
- Dated 8 Aug 2018Public notice: Draft Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Public Notice
- Dated 6 Aug 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.