CERC · Central Electricity Regulatory Commission

Open Access in inter-State Transmission, 2008 — Third Amendment, 2014 — Explanatory Memorandum — Draft

Draft 'Central Electricity Regulatory Commission (Open Access in Inter-State Transmission) (Third Amendment) Regulations, 2014'

Explanatory memorandum to a draftReleased with the notice dated 3 Jul 2014

Explanatory memorandum to the Open Access in inter-State Transmission Regulations, 2008 — Third Amendment, 2014 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is CERC's explanatory memorandum for a draft Third Amendment to the 2008 Open Access in Inter-State Transmission Regulations (p1). It explains why the Commission proposes to replace Regulation 17, which currently sets operating charges for NLDC, RLDC and SLDC scheduling in collective and bilateral transactions (p1). The first part sets out the existing charges, including a flat daily charge on power exchanges and a per-RLDC charge on bilateral applicants, and records PXIL's petition 124/MP/2013 asking for an allocation methodology; the Commission directed staff to analyse historical data and propose an amendment to Regulation 17 (pp1–3).

Part 2 evaluates four options for NLDC operating charges: keep the regional-entity levy but reduce it; levy per participant; remove charges for short-term open access; or levy per MWh of scheduled energy. It rejects the first three and proposes the per-MWh option at end-customer level, with power exchanges collecting and passing charges to NLDC. It extends the same principle to bilateral transactions and proposes caps so large transactions do not bear excessive charges (pp3–7).

Part 3 presents the data analysis, showing the average operating charge in ₹/MWh over August 2012–July 2013, and proposes reducing it by 50%, rounded down, so that the proposed operating charge is ₹1.80/MWh; the actual rate would be notified by Commission order using a rolling one-year data window, so it could vary (pp8–9). Part 4 works through bilateral and collective transaction illustrations, including PoC loss adjustment and the interaction with SLDC charges (pp9–12).

Part 5 explains the shift from flat SLDC charges to a per-MWh SLDC operating charge at the same proposed rate, with a cap and with applicability only if the State Commission has not notified the SLDC charge (pp12–16). The final part states the proposed amendments: replace Regulation 17, define NLDC and SLDC operating charges in Regulation 2, and amend Regulation 8(3)(a) to allow an affidavit for purchase as well as sale of power (p16).

Standard name
Open Access Regulations
Primary topics
Open access charges, SLDC and RLDC fees and charges, Open access

Read with this

The regulation

Other copies of these documents (6)

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page