CERC · Central Electricity Regulatory Commission
Open Access in inter-State Transmission, 2008 — Third Amendment, 2014 — Explanatory Memorandum — Draft
Draft 'Central Electricity Regulatory Commission (Open Access in Inter-State Transmission) (Third Amendment) Regulations, 2014'
Explanatory memorandum to a draftReleased with the notice dated 3 Jul 2014
Draft
The draft has since been finalised as the Open Access in inter-State Transmission (Third Amendment) Regulations, 2015.
Explanatory memorandum to the Open Access in inter-State Transmission Regulations, 2008 — Third Amendment, 2014 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is CERC's explanatory memorandum for a draft Third Amendment to the 2008 Open Access in Inter-State Transmission Regulations (p1). It explains why the Commission proposes to replace Regulation 17, which currently sets operating charges for NLDC, RLDC and SLDC scheduling in collective and bilateral transactions (p1). The first part sets out the existing charges, including a flat daily charge on power exchanges and a per-RLDC charge on bilateral applicants, and records PXIL's petition 124/MP/2013 asking for an allocation methodology; the Commission directed staff to analyse historical data and propose an amendment to Regulation 17 (pp1–3).
Part 2 evaluates four options for NLDC operating charges: keep the regional-entity levy but reduce it; levy per participant; remove charges for short-term open access; or levy per MWh of scheduled energy. It rejects the first three and proposes the per-MWh option at end-customer level, with power exchanges collecting and passing charges to NLDC. It extends the same principle to bilateral transactions and proposes caps so large transactions do not bear excessive charges (pp3–7).
Part 3 presents the data analysis, showing the average operating charge in ₹/MWh over August 2012–July 2013, and proposes reducing it by 50%, rounded down, so that the proposed operating charge is ₹1.80/MWh; the actual rate would be notified by Commission order using a rolling one-year data window, so it could vary (pp8–9). Part 4 works through bilateral and collective transaction illustrations, including PoC loss adjustment and the interaction with SLDC charges (pp9–12).
Part 5 explains the shift from flat SLDC charges to a per-MWh SLDC operating charge at the same proposed rate, with a cap and with applicability only if the State Commission has not notified the SLDC charge (pp12–16). The final part states the proposed amendments: replace Regulation 17, define NLDC and SLDC operating charges in Regulation 2, and amend Regulation 8(3)(a) to allow an affidavit for purchase as well as sale of power (p16).
Read with this
The regulation
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
Amendments and corrections
- Dated 20 May 2009Open Access in inter-State Transmission (Amendment) Regulations, 2009
- Dated 10 Jun 2009Open Access in inter-State Transmission Regulations, 2008 — Corrigendum, 2009
- Dated 10 Jun 2009Open Access (Amendment) Regulations, 2009 — Corrigenda
- Dated 11 Sep 2013Open Access in inter-State Transmission (Second Amendment) Regulations, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020Open Access Regulations, 2008 — Sixth Amendment — Commencement Notification, 2020
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 4 Mar 2008Open Access in Inter-State Transmission System Regulations, 2008 — Statement of Reasons
- Dated 1 Jul 2009Open Access in Inter-State Transmission Regulations, 2008 — 2009 Amendment — Statement of Reasons
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015 — Statement of Objects and Reasons
- Dated 12 Jul 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016 — Statement of Objects and Reasons
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 21 Mar 2022Notification — effective date 01.05.2022
- Dated 21 Mar 2022Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Commencement Notification
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 1 Apr 2022Approval of Procedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
- Dated 1 Apr 2022Short Term Open Access in Inter-State Transmission through NOAR — Procedure, 2022
- Dated 6 May 2022Corrigendum to the NOAR STOA Procedure Order, 2022
- Date not statedProcedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
Other copies of these documents (6)
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
- Dated 11 Sep 2013Open Access in inter-State Transmission Regulations, 2008 — Second Amendment, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019
Earlier drafts
- Dated 3 Jul 2014Open Access in inter-State Transmission Regulations, 2008 — Third Amendment, 2014 — Draft
- Dated 3 Jul 2014Public notice: Open Access in inter-State Transmission (Third Amendment) Regulations, 2014 — Public Notice — Draft
- Dated 3 May 2016Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Draft
- Dated 3 May 2016Public notice: Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 3 May 2016Explanatory memorandum: Open Access in Inter-state Transmission (Fourth Amendment) Regulations, 2016 — Explanatory Memorandum — Draft
- Dated 8 Aug 2018Open Access in inter-State Transmission Regulations, 2008 — Fifth Amendment, 2018 — Draft
- Released with the notice dated 8 Aug 2018Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Fifth Amendment — Draft Explanatory Memorandum
- Dated 8 Aug 2018Public notice: Draft Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Public Notice
- Dated 6 Aug 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.