CERC · Central Electricity Regulatory Commission
Open Access in inter-State Transmission (Second Amendment) Regulations, 2013
Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Second Amendment) Regulations, 2013
AmendmentDated 11 Sep 2013No.L-7/105(121)/2007-CERC dated 11th September 2013
Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Open Access in inter-State Transmission Regulations, 2008.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Commission amends its 2008 inter-State open access regulations in twelve clauses, issued 11 September 2013 (p1). The regulations take effect from the date of publication in the Official Gazette, but the Gazette date is not printed (p1). Much of the amendment tightens the State-level clearance route into the power market.
Clauses 2 and 3 (pp1–2) add a definition of "intra-day transaction/contingency transaction" — a transaction arising on day T after the day-ahead window closes with delivery on T or T+1, scheduled by RLDC/NLDC — recast the definition of "intra-State entity", delete a reference to a State Transmission Utility from another definition, and replace a reference to "the Grid Code" with "any other regulations made by the Commission".
Clause 3 (pp2–6) rewrites Regulation 8: SLDC-issued "No Objection"/"Prior Standing Clearance" for State utilities and intra-State entities trading through power exchanges and the aggregate MW it covers; its use for collective day-ahead and intra-day/contingency transactions; notarised affidavits on existence of a valid contract and absence of double-selling; deemed clearance where the SLDC does not respond within three working days; and a seven-day debarment the Commission may impose after hearing for breach of the cleared quantum or time.
Clauses 4–9 (pp6–10) cover scheduling on forced outage (by reference to the Grid Code), operating charges on downward revision or cancellation, transmission charges (including a default rate where the State Commission has not determined State-network charges), Special Energy Meter installation, transmission losses, and deviation (unscheduled interchange) charges by reference to the 2009 UI regulations. Clause 11 recasts Regulation 25A to bar short-term open access to willful payment defaulters when the Commission, NLDC or RLDC so directs, and clause 12 substitutes a reference. A closing Note (p11) records where the Principal Regulations, their 2009 amendment and the 2009 corrigendum were published.
Read with this
The regulation
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
Amendments and corrections
- Dated 20 May 2009Open Access in inter-State Transmission (Amendment) Regulations, 2009
- Dated 10 Jun 2009Open Access in inter-State Transmission Regulations, 2008 — Corrigendum, 2009
- Dated 10 Jun 2009Open Access (Amendment) Regulations, 2009 — Corrigenda
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020Open Access Regulations, 2008 — Sixth Amendment — Commencement Notification, 2020
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 4 Mar 2008Open Access in Inter-State Transmission System Regulations, 2008 — Statement of Reasons
- Dated 1 Jul 2009Open Access in Inter-State Transmission Regulations, 2008 — 2009 Amendment — Statement of Reasons
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015 — Statement of Objects and Reasons
- Dated 12 Jul 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016 — Statement of Objects and Reasons
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 21 Mar 2022Notification — effective date 01.05.2022
- Dated 21 Mar 2022Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Commencement Notification
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 1 Apr 2022Approval of Procedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
- Dated 1 Apr 2022Short Term Open Access in Inter-State Transmission through NOAR — Procedure, 2022
- Dated 6 May 2022Corrigendum to the NOAR STOA Procedure Order, 2022
- Date not statedProcedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
Other copies of these documents (6)
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
- Dated 11 Sep 2013Open Access in inter-State Transmission Regulations, 2008 — Second Amendment, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019
Earlier drafts
- Dated 3 Jul 2014Open Access in inter-State Transmission Regulations, 2008 — Third Amendment, 2014 — Draft
- Dated 3 Jul 2014Public notice: Open Access in inter-State Transmission (Third Amendment) Regulations, 2014 — Public Notice — Draft
- Released with the notice dated 3 Jul 2014Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Third Amendment, 2014 — Explanatory Memorandum — Draft
- Dated 3 May 2016Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Draft
- Dated 3 May 2016Public notice: Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 3 May 2016Explanatory memorandum: Open Access in Inter-state Transmission (Fourth Amendment) Regulations, 2016 — Explanatory Memorandum — Draft
- Dated 8 Aug 2018Open Access in inter-State Transmission Regulations, 2008 — Fifth Amendment, 2018 — Draft
- Released with the notice dated 8 Aug 2018Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Fifth Amendment — Draft Explanatory Memorandum
- Dated 8 Aug 2018Public notice: Draft Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Public Notice
- Dated 6 Aug 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.