CERC · Central Electricity Regulatory Commission

Open Access (Amendment) Regulations, 2009 — Corrigenda

Gazette – Open Access (Amendment) Regulations, 2009

CorrigendumDated 10 Jun 2009Published in the Gazette 24 Jul 2009No. L-7/105(121)/2007-CERC dated the 10th June, 2009

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Corrects the Open Access in inter-State Transmission Regulations, 2008 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page Gazette corrigenda issued by the Central Electricity Regulatory Commission, printed at p1, correcting the CERC (Open Access in Inter-State Transmission) Regulations, 2008 as already amended by the (Amendment) Regulations, 2009. It makes two textual corrections only (p1). First, in the second proviso to clause (4) of regulation 8, the words and figures "under clause (1) of regulation 9" are omitted. Second, in clause (6) of regulation 25, the phrase "an Inter-State entity" is replaced by "a State utility".

The corrigenda is dated 10 June 2009 but appears in the Gazette of India, Extraordinary, Part III, Section 4, No. 129, published 24 July 2009 (p1). A closing note records where the parent 2008 Regulations (7 February 2008) and the 2009 Amendment Regulations (29 May 2009) were themselves gazetted (p1). Nothing else is set out: no definitions, no savings clause, no separate commencement provision. For an analyst, this document matters only as the authoritative fix to the wording of regulations 8(4) and 25(6); the substantive rules remain in the 2008 Regulations as amended.

Standard name
Open Access Regulations
Primary topics
Open access

Read with this

The regulation

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document