Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Draft

CentralElectricity Regulatory Commission (Open Access in inter-State Transmission) (Fourth Amendment) Regulations, 2016

Draft amendmentDated 3 May 2016No.L-7/105(121)/2007-CERC: dated 03 th May, 2016

Draft

A proposal that has since been finalised as the Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC draft notification, dated 3 May 2016, proposing the Fourth Amendment to the CERC (Open Access in inter-State Transmission) Regulations, 2008, which it calls the Principal Regulations (p1). It is a one-clause amendment: Regulation 17(2) of the Principal Regulations is substituted in full (p1).

The substituted sub-clause governs NLDC operating charges on collective transactions. It specifies the basis of the charge — energy scheduled in MWh at the regional periphery by NLDC for transactions in the respective power exchange — payable by each successful buyer and seller; it sets the rate at Rs 1/MWh and caps the amount payable by each entity at Rs 200 per day; and it requires the power exchanges to collect the charges and transfer them to NLDC daily (p1). The rest of Regulation 17 and the Principal Regulations are untouched.

Page 2 is a Note setting out the publication history of the Principal Regulations: their original notification on 7.2.2008 and the three earlier amendments (2009, 2013, 2015) plus a 2009 corrigendum, placing this instrument fourth in that sequence (p2).

The amendment takes effect from publication in the Official Gazette; no Gazette date is printed (p1).

Standard name
Open Access Regulations
Primary topics
SLDC and RLDC fees and charges

Read with this

The regulation

Other copies of these documents (6)

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document