Corrigendum to the NOAR STOA Procedure Order, 2022

Corrigendum to the order dated 1.4.2022 in Order No.-L-7/105(121)/2007-CERC

OrderDated 6 May 2022No.-L-7/105(121)/2007-CERC dated 6 th May, 2022

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Open Access in inter-State Transmission Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page corrigendum issued by CERC on 6 May 2022, correcting the Annexure to its earlier order dated 1.4.2022 that approved the Procedure for Short Term Open Access in inter-State Transmission through the National Open Access Registry (NOAR). The Commission states that certain inadvertent typographical errors crept into that Annexure, and it uses its power under Regulation 103A of the Conduct of Business Regulations, 1999 to fix them (p1–2).

Three changes are made. At page 7, a cross-reference to "Regulation 8(1) of Principal Regulations" is reworded to "Regulation 8 of the Principal Regulations" (p2). At page 8, paragraph 7.1 on applications for scheduling of bilateral and collective STOA transactions through NOAR is substituted in full, requiring applications to be made through NOAR by short term customers registered in NOAR with a valid standing clearance under the Principal Regulations (p2). Paragraph 7.2 at page 8 is deleted outright (p2).

The corrigendum expressly preserves everything else: all other terms of the 1.4.2022 order remain unchanged (p2). It matters to anyone operating or reading the NOAR STOA procedure, because two operative paragraphs of that procedure are altered by reference to page and paragraph numbers in the original Annexure rather than restated.

Standard name
Open Access Regulations
Primary topics
Open access

Read with this

The regulation

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document