CERC · Central Electricity Regulatory Commission
Sharing of Inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2025
Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2025
AmendmentDated 26 Jun 2025No. L-1/250/2019/CERC dated 26.06.2025
Amends the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fourth Amendment to CERC's Sharing of Inter-State Transmission Charges and Losses Regulations, 2020, notified on 26 June 2025 under s.178 read with Part V of the Electricity Act, 2003 (p1). It takes effect from the date of publication in the official Gazette, though the Gazette date is not printed (p1). It is drafted as a series of textual substitutions into the Principal Regulations rather than a freestanding instrument.
The opening clauses add two definitions to Regulation 2 — 'Tariff Regulations' (the CERC 2024 Tariff Regulations) and 'Terminal Bay' (borrowed from the GNA Regulations) — and rework charge sharing in two situations: drawee DICs inside a State control area that hold their own separate GNA and are outside the State distribution licensee's GNA are apportioned AC-UBC charges in proportion to their GNA (p1–2); and a generating station connected to both the inter-State and intra-State systems has its transmission deviation measured as net metered ex-bus injection above the sum of its ISTS GNA and its STU access, with STU required to share access details with NLDC and CTU (p2).
Most of the document (p2–7) rewrites Regulation 13, the transmission-charge waiver regime. Five tables set out eligibility windows and waiver periods by technology: REGS/RHGS based on wind or solar (Table 1), Battery ESS including co-located charging arrangements and a contingency grid-charging cap (Table 2), hydro generating stations (Table 3), offshore wind REGS (Table 4) and green hydrogen/green ammonia plants as drawee DICs (Table 5). A 'whichever is higher' rule applies to green hydrogen plants drawing from several eligible sources, illustrated by two worked examples (p4–5). New sub-clauses add force majeure-linked extension of scheduled COD and a self-declaration-plus-NLDC-verification mechanism for the storage charging criterion (p6). Terminal Bay charges become payable by connectivity grantees whose generation capacity has not achieved COD (p7). Two new clauses deal with transmission system availability (referred to the Tariff Regulations, notwithstanding a TSA under tariff-based competitive bidding) and with CTU working out yearly transmission charges where element-wise charges are unavailable (p7). A Note records the gazette publication details of the Principal Regulations and the First to Third Amendments (p8).
Read with this
The regulation
Amendments and corrections
- Dated 7 Feb 2023Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023
- Dated 28 Sep 2023Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023 — Corrigendum
- Dated 28 Sep 2023Corrigendum to the Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023
- Dated 20 Oct 2023Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023
- Dated 26 Oct 2023Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2023
- Dated 25 Jul 2025Errata (Gazette No. 544)
Commencement notices and reasons
- Dated 8 Aug 2020Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — commencement notification
- Dated 8 Aug 2020Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Commencement Notification, effective 01.11.2020
- Dated 10 Aug 2020Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Statement of Reasons
- Dated 3 Aug 2023Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023 — Commencement Notification
- Dated 3 Aug 2023Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023 — Commencement Notification
- Dated 30 Oct 2023Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Third Amendment, 2023 — Statement of Reasons
- Dated 31 Jul 2024Sharing of Inter-State Transmission Charges and Losses, 2020 — Second Amendment, 2023 — Statement of Reasons
Procedures and orders made under it
- Dated 14 Feb 2021Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Removal of Difficulties Order
- Dated 30 Dec 2022Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Removal of Difficulties Order, 2022
- Dated 12 Jun 2023Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Removal of Difficulties Order, 2023
- Dated 30 Jul 2025Constitution of Committee for Extension of SCOD under Sharing Regulations, 2020 — Office Order, 2025
- Dated 14 Jan 2026Addendum to Office Order dated 30.07.2025 — SCOD extension Committee, Sharing on Inter-State Transmission Charges and Losses Regulations, 2020
Other copies of these documents (5)
- Dated 4 May 2020Sharing of Inter-State Transmission Charges and Losses Regulations, 2020
- Dated 7 Feb 2023Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023
- Dated 20 Oct 2023Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023
- Dated 26 Oct 2023Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2023
- Dated 26 Jun 2025Sharing of Inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2025
Proposed changes (drafts with no final yet)
- Dated 31 Jul 2026Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Draft
- Dated 31 Jul 2026Public notice: Sharing of inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Public Notice — Draft
- Dated 31 Jul 2026Explanatory memorandum: Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 3 Sep 2026Notice extending the date for comments: Public notice extending comment deadline on Draft Sharing of inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026
- Dated 18 Sep 2026Hearing notice: Public hearing notice — Sharing of inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026
- Dated 26 Oct 2026File: Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Fifth Amendment, 2026 — Supplementary Draft Notification
- Dated 26 Oct 2026Public notice: Sharing of inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Supplementary Draft — Public Notice
- Dated 26 Oct 2026Explanatory memorandum: Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Supplementary Explanatory Memorandum — Draft
- Dated 16 Nov 2026Hearing notice: Draft Sharing of inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Public Hearing Notice, 2.12.2026
Earlier drafts
- Dated 31 Oct 2019Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Draft
- Dated 31 Oct 2019Public notice: Public Notice on Draft Sharing of Inter-State Transmission Charges and Losses Regulations, 2019
- Released with the notice dated 31 Oct 2019Explanatory memorandum: Task Force Report to Review Framework of Point of Connection (PoC) Charges, 2019
- Released with the notice dated 31 Oct 2019Explanatory memorandum: Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Draft
- Dated 2 Dec 2019Notice extending the date for comments: Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Public Notice Extending Comment Deadline
- Dated 3 Dec 2019Explanatory memorandum: Explanatory Memorandum to Draft Sharing of Inter-State Transmission Charges and Losses Regulations, 2019
- Dated 9 Jan 2020Hearing notice: Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Public Hearing Notice, 29.01.2020
- Dated 29 Sep 2022Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — public hearing rescheduling notice
- Dated 11 Jun 2022Public notice: Draft Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — Public Notice
- Dated 11 Jun 2022File: Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — Draft
- Dated 9 Jul 2022Notice extending the date for comments: Public Notice — Extension of comments deadline on Draft Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022
- Dated 18 Aug 2022Notice extending the date for comments: Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — Supplementary Notification (Public Notice)
- Dated 18 Aug 2022File: Supplementary Draft Notification — Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022
- Dated 19 Sep 2022Explanatory memorandum: Draft Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 and Supplementary Amendment — Explanatory Memorandum
- Dated 21 Sep 2022Hearing notice: Draft Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — Public Hearing Notice
- Dated 21 Sep 2022Notice extending the date for comments: Draft Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — comment deadline extension notice
- Dated 17 Mar 2023Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023 — Draft
- Dated 17 Mar 2023Public notice: Draft Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023 — Public Notice
- Dated 24 Mar 2023Explanatory memorandum: Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 26 Apr 2023Hearing notice: Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023 — Public Hearing Notice
- Dated 12 Jun 2023Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Third Amendment, 2023 — Draft
- Dated 12 Jun 2023Explanatory memorandum: Draft Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2023 — Explanatory Memorandum
- Dated 12 Jun 2023Public notice: Sharing of Inter-State Transmission Charges and Losses — Third Amendment, 2023 — Public Notice — Draft
- Dated 28 Aug 2023Hearing notice: Rescheduling of Public Hearing for Draft Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2023
- Dated 9 Oct 2024Sharing of Inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2024 — Draft
- Dated 9 Oct 2024Public notice: Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 28 Oct 2024Explanatory memorandum: Sharing of Inter-State Transmission Charges and Losses, 2020 — Fourth Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 11 Nov 2024Notice extending the date for comments: Extension of last date for comments on Draft Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2024 — Public Notice
- Dated 10 Dec 2024Hearing notice: Public hearing notice — Draft Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2024
11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.