Skip to content

CERC · Central Electricity Regulatory Commission

Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023 — Corrigendum

CENTRAL ELECTRICITY REGULATORY COMMISSION CORRIGENDUM

CorrigendumDated 28 Sep 2023Published in the Gazette 19 Oct 2023F. No. L-1/250/2019/CERC dated 28th September, 2023

Corrects the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page CERC corrigendum — Hindi on page 1, English on page 2 — issued in New Delhi on 28 September 2023 and carried in the Gazette of India Extraordinary of 19 October 2023 (p1–2). It makes four corrections to the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (First Amendment) Regulations, 2023, notified as F. No. L-1/250/2019/CERC dated 07.02.2023 and gazetted on 01.03.2023 (p2).

Two corrections are textual: the words "under Step-1" are deleted from the last column of the first row of Table I and Table II under Regulation 13(2)(f), and a cross-reference in the last line of Annexure III, Clause 1(f) is changed from Regulation 15(2)(b) to Regulation 15(2)(a) (p2).

The other two restate definitions inside the Annexure III formulae: the expanded meaning of "T" under Clause 2(b)(i), and the expanded meaning of "Waiver" under Clause 2(b)(ii) (p2). The corrigendum is signed by Harpreet Singh Pruthi, Secretary (p2).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document