Skip to content

CERC · Central Electricity Regulatory Commission

Addendum to Office Order dated 30.07.2025 — SCOD extension Committee, Sharing on Inter-State Transmission Charges and Losses Regulations, 2020

Addendum to Office Order dated 30.07.2025 regarding constitution of Committee for recommending Extension of Time in SCOD for the specific projects under Regulations 13(2)(h) of CERC (Sharing on Inter-State Transmission Charges and Losses) Regulations, 2020.

OrderDated 14 Jan 2026No. L-1/250/2019/CERC dated 14.01 .2026

Made under the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page addendum (p1) to CERC's Office Order dated 30.07.2025, which had constituted a Committee to recommend extension of time in the Scheduled Commercial Operation Date (SCOD) for specified projects under Regulation 13(2)(h) of the CERC (Sharing on Inter-State Transmission Charges and Losses) Regulations, 2020.

Paragraph 2 inserts an Explanation to Steps 2 and 3 under Paragraph 3 of that order, laying down the procedural route that follows a Committee recommendation: the Committee submits its recommendation as a Report to the Commission, with a copy to the applicant REGS or ESS; the applicant then approaches the Commission through a Miscellaneous Petition attaching the Committee's report and supporting documents; and the Commission passes the necessary order after hearing (p1).

Paragraph 3 responds to the fact that the Committee has already recommended in a number of matters under the 30.07.2025 order: it directs the Committee to share its report with the applicant REGS or ESS in those matters so that they can file a petition (p1).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document