Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2023

Amendment · Gazette copyDated 20 Oct 2023Published in the Gazette 27 Oct 2023In force from 1 Nov 2023No. L-1/250/2019/CERC dated 20th October, 2023

The Gazette copy of the Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020, notified by the Central Electricity Regulatory Commission under Section 178 read with Part V of the Electricity Act, 2003 (p4). It was issued on 20 October 2023 and published in the Gazette on 27 October 2023 (p1, p4), and takes effect from 1 November 2023 (p4).

Its centrepiece is a new concept of "Deemed COD" for transmission systems. Regulation 2 inserts a definition of Deemed COD into Regulation 2 of the Principal Regulations, distinguishing systems under the regulated tariff mechanism from those under Tariff Based Competitive Bidding, and cross-referring to the Grid Code 2023 deemed-COD provisos, the Tariff Regulations 2014 and 2019, and Transmission Service Agreements signed before 1 October 2023 (p4).

Regulations 3 and 4 make consequential linkage changes in Regulations 11 and 12 — the adjustment and disbursal sequence of collected charges now runs through the new Regulation 13(12) sub-clauses (p4–5). Regulation 5 is the substantive one: it substitutes Regulation 13(12) wholesale, replacing the word "is delayed" with "has not been achieved" in Regulation 13(3) (p5) and laying out a payment regime for transmission licensees whose systems have achieved deemed COD but not physical power flow — a step-down then step-up of Yearly Transmission Charges over time, the order of priority for funding those payments (T-GNA/T-GNARE collections, then the Deviation and Ancillary Service Pool Account under the DSM Regulations), treatment of transformer-component elements billed to the drawee DIC of the State, and liability rules where an inter-State or intra-State licensee is responsible for delaying another licensee's system (p5–6).

The closing Note records the publication history of the Principal Regulations (1 July 2020) and the First Amendment (1 March 2023) (p6).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Competitive bidding

Read with this

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document