Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Draft

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2019

Explanatory memorandum to a draftReleased with the notice dated 31 Oct 2019

Draft

The draft has since been finalised as the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020.

Explanatory memorandum to the Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the report of the CERC committee set up in May 2019 under Member (Technical) I.S. Jha to convert the A.S. Bakshi Taskforce's March 2019 recommendations into a draft replacement for the 2010 sharing regulations, together with the enclosed draft regulations (pp1, 5-6). The report (pp4-25) traces how ISTS charges have been shared — regional postage stamp, then the Point of Connection mechanism using quarterly projected load flow — and records stakeholders' objection that the full cost of a line falls on whoever uses it even where the line is marginally used or built for contingency (pp4-5).

The committee's answer is a four-part structure for each DIC's charges: a National Component (systems built specifically for renewable energy, socialised across all ISTS customers, plus named HVDC elements), a Regional Component (the balance of bipole HVDC and voltage-support assets such as STATCOM, SVC and bus reactors), a Transformers Component (downstream ICTs billed to the state where they sit), and an AC System Component split between a usage-based part computed from actual peak-block load flow and a balance part shared on contracted LTA+MTOA (pp8-21).

The draft — CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2019 — carries this into six chapters (pp28-57): preliminary provisions and definitions; the components and the basis for sharing each; specific cases including renewable charge waivers, delayed COD of generators or transmission, start-up power, dedicated lines, part operationalisation of LTA and deemed COD; accounting, billing, collection and credit security, with three bills (including a transmission deviation bill), a 45-day due date, Letter of Credit requirements and an event-of-default procedure; information, data timelines and publication duties of the Implementing Agency; and savings, repeal, relaxation and removal of difficulties.

Annexure I (pp58-71) sets out the hybrid methodology — average participation to identify slack buses, marginal participation to allocate line costs — and Annexure II (p72) gives the surge impedance loading values used to turn line flow into percentage utilisation. The committee also recommends dispensing with the separate Model TSA, RSA and billing procedure, replacing loss slabs with a weekly all-India average loss, and not levying separate STOA transmission charges (pp21-24). It records that simulations showed the MW-kM option for the balance component differed little from simple MW allocation and recommends the simpler method (pp16-17). The draft is undated and would come into force on a date to be separately notified (p28); on enactment it repeals the 2010 regulations with a savings clause (p57).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Losses and loss reduction, Billing and payment

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.