Skip to content

CERC · Central Electricity Regulatory Commission

Sharing of Inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2024 — Draft

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2024

Draft amendmentDated 9 Oct 2024No. L-1/250/2019/CERC dated 9.10.2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's draft of the Fourth Amendment to the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020, issued on 9.10.2024 under Section 178 read with Part V of the Electricity Act, 2003, to take effect from the date of publication in the official Gazette (p1). Its centre of gravity is the transmission-charge waiver regime for renewable generation, storage, hydro and green hydrogen/ammonia.

Clause 2 adds two definitions to Regulation 2 of the Principal Regulations — the Tariff Regulations, 2024, and 'Terminal Bay', the latter borrowed from the GNA Regulations (p1). Clause 3 inserts a proviso into Regulation 12(1)(a) prescribing how transmission deviation is computed where an entity has both ISTS GNA and STU connectivity, i.e. net metered ex-bus injection in excess of the two (p1–2).

Clause 4 carries almost the whole document: it adds offshore-wind REGS to the waiver-eligible categories, removes Hydro PSP ESS from the standalone list, and inserts new sub-clauses giving Hydro PSP ESS and Battery ESS waivers keyed to contract-award or COD deadlines (p2). It substitutes the waiver-calculation sub-clause so that projects missing those deadlines receive tapered waiver percentages depending on their COD window, with separate schedules for wind/solar REGS, battery ESS, new hydro projects, offshore wind and green hydrogen/green ammonia drawee DICs, and worked illustrations showing a drawee DIC taking the higher of its own and its supplier's waiver (p3–5). It also inserts a force-majeure clause allowing COD extension without losing waiver eligibility, substitutes the proviso on Yearly Transmission Charges for terminal bays where the connectivity grantee's COD is delayed, extends terminal-bay treatment through other clauses, and adds a clause making transmission-system availability follow the Tariff Regulations notwithstanding the Transmission Service Agreement (p5–6). A closing Note records the publication history of the Principal Regulations and the First to Third Amendments (p6).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Energy storage deployment, Connectivity and GNA

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document