Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023 — Explanatory Memorandum — Draft

Draft Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2023 along with Draft Supplementary Amendment

Explanatory memorandum to a draftDated 24 Mar 2023No. L-1/250/2019/CERC dated 24.3.2023

Explanatory memorandum to the Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum dated 24 March 2023 (p1) for the draft Second Amendment to the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020, together with a draft Supplementary Amendment. Part 1 (pp1–4) sets out the background: the principal Sharing Regulations 2020 were notified on 4 May 2020 and made effective from 1 November 2020; the First Amendment Regulations 2023, notified on 7 February 2023, is yet to become effective and was intended to align the sharing regime with the CERC GNA Regulations 2022 (p1). The memorandum explains that the 2020 regulations make a defaulting entity liable to pay 100% of yearly transmission charges (YTC) where a transmission system is under deemed COD, and that the proposed amendment responds to a Ministry of Power direction under section 107 of the Electricity Act 2003 (p1), APTEL advice, and a Supreme Court judgment that beneficiaries cannot be made liable before a transmission line is operational (p2). It identifies three mismatch scenarios — generation-transmission, transmission-transmission, and transmission-upstream/downstream STU systems — and reviews CERC statutory advice on TBCB project packaging, implementation agreements and deemed COD windows (pp2–4).

Part 2 (pp4–5) contains the proposed draft amendment. It focuses on Regulation 13(12) of the principal regulations and consequential changes to Regulations 2, 11 and 12 (pp4–5). For an inter-State transmission system under deemed COD, it proposes payment of 20% of YTC for six months from deemed COD or until actual power flow, whichever is earlier, and 100% of YTC from the seventh month if power flow has not commenced (p5). It also proposes liabilities for a defaulting inter-State transmission licensee (20% of the lower of its own YTC or the deemed-COD system's YTC) and for a defaulting intra-State transmission licensee (20% of the deemed-COD inter-State system's YTC) until the delayed system achieves COD (p5). The first year of the contract is proposed to start when the licensee begins receiving 100% YTC (p5). The memorandum's stated aim is equitable sharing of costs while avoiding stranded assets and unduly prolonged denial of tariff to ready transmission licensees (pp4–5).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document