Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Statement of Reasons

Statement of Reasons

Statement of reasonsDated 10 Aug 2020No.L-1/250/2019/CERC dated 10th August 2020

The commission's reasons for the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 131. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons for the Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2020, dated 10 August 2020 (p1). It explains why the Commission replaced the 2010 sharing framework after the Bakshi Committee review, the Jha Committee draft, public consultation on the 2019 draft and a public hearing, and it records stakeholder comments with the Commission's analysis and decisions clause by clause (p1–4). The 2020 Regulations are stated to have been notified on 4 May 2020 (p3).

The portion begins with the statutory and policy basis — Section 61 of the Electricity Act and the National Electricity Policy/Tariff Policy requirements for a distance-, direction- and flow-sensitive transmission tariff — and the history of the 2010 Sharing Regulations and their amendments (p1–3). It then takes the draft definitions in Regulation 2: Basic Network voltage coverage, buyer, Designated ISTS Customer, Peak Block, Target Region, Untied LTA, and Yearly Transmission Charges, explaining why alternatives such as regional peaks or lower-voltage modelling were not accepted (p4–10).

Sections on draft Regulations 3–6 cover when transmission charges after COD are shared, the four charge components, National Component-Renewable Energy, National Component-HVDC, Regional Component-HVDC, and stability/reliability elements such as STATCOM, SVC, bus reactors and spare transformers/reactors (p10–21). The SoR explains how the National, Regional, Renewable and HVDC components are allocated between drawee DICs and injecting DICs with untied LTA, and it records issues left to CTU, the implementing agency or later Commission orders (p11–22).

Draft Regulation 7 is on the Transformers Component: only ISTS drawl transformers are billed, generally to the host State's drawee DICs, with feeder-ratio apportionment where a transformer serves more than one State, and with NC-RE/evacuation transformer exclusions (p22–26). Draft Regulation 8 is on the AC System Component split into AC-UBC, based on line usage, and AC-BC, the balance shared on LTA plus MTOA and untied LTA; the Commission rejects full usage-based pricing and RoE changes (p26–31).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Open access, Late payment surcharge and rebate

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document