Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020

Regulation · Gazette copyDated 4 May 2020Published in the Gazette 1 Jul 2020No.L-1/250/2019/CERC dated 4th May 2020

The Gazette copy of the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020 — notification No. L-1/250/2019/CERC dated 4 May 2020 (p19), published in the Gazette of 1 July 2020 (p1) — replace the 2010 sharing regulations and prescribe how the annual transmission charges of the inter-State transmission system are apportioned among its users. They apply to Designated ISTS Customers, inter-State transmission licensees, NLDC, RLDCs, SLDCs and RPCs (p20), and are to come into force on a date the Commission notifies separately (p20).

Chapter 2 splits ISTS charges into four buckets — National, Regional, Transformer and AC System — and sets how each is shared: renewable-energy and HVDC elements in the national pool, region-specific HVDC and grid-stability assets regionally, inter-connecting transformers state-wise, and the residual AC system through a usage-based component derived from peak-block load flow plus a balance component shared on LTA/MTOA quantum (p22–24). It gives the weekly all-India method for sharing transmission losses (p24), the State-wise Short Term Open Access rate (p24) and a Transmission Deviation charge for drawal beyond granted access (p25).

Chapter 3 addresses special cases: waiver of charges and losses for solar and wind projects by commissioning window, and treatment of Associated Transmission Systems, delayed generation or transmission COD, dedicated lines, start-up power and deemed-COD TBCB assets (p25–27).

Chapter 4 covers accounting, billing and collection — a three-bill cycle with timelines, due date, rebate, late payment surcharge, letter of credit, disbursement and consequences of non-payment, plus a two-billing-period transition under the 2010 regulations (p27–30). Chapter 5 sets the Implementing Agency's duty to publish procedures, formats and data and the timelines for information submission (p30–31); Chapter 6 repeals the 2010 regulations with savings and gives the Commission power to relax and to remove difficulties (p31). Annexure-I details the Hybrid Methodology for usage-based charges (p31–36); Annexure-II lists Surge Impedance Loading by voltage (p37).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Losses and loss reduction, Open access

Read with this

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.