Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Fifth Amendment, 2026 — Supplementary Draft Notification

Supplementary Draft Notification

Published with a draftDated 26 Oct 2026L-1/250/2019/CERC dated 26.10.2026

Draft

Voltaic holds no final regulation made from this draft.

Published with the Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC supplementary draft notification dated 26.10.2026 (p1). It adds further proposals to the draft Fifth Amendment to the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020, which were published on 31.07.2026 (p1). It is not a final regulation: it sets out two new sub-clauses to be inserted into Regulation 13(2) of the Principal Regulations, both dealing with waiver of inter-state transmission charges for renewable capacity.

The first, sub-clause (h-i) (p1–3), opens a separate waiver route for wind or solar generating stations and wind-plus-solar hybrid stations that have entered a PPA or PSA of at least seven years with a drawee DIC — directly or through a trading licensee or Renewable Energy Implementing Agency — on or before 31.03.2027, and whose delivery slips because transmission is not available beyond the later of the CTUIL-communicated start date of connectivity or the contractual SCOD (p1). Waiver follows a trajectory keyed to the project's COD in Table 6, subject to a maximum of 25 years from COD (p2). Evidentiary conditions follow: PPA and PSA copies to CTUIL and NLDC by 30.04.2027, both contracts where a trading licensee or agency sits in the chain; tenure extensions stay covered within the cap; contracts signed late or not furnished in time are excluded; and the waiver lapses if the contract is terminated early, in which case the general Table 1 trajectory applies (p2–3).

The second, sub-clause (h-ii) (p3), makes the two waiver routes mutually exclusive: a project eligible under both must file an undertaking with NLDC and CTUIL within thirty days of COD choosing one, and the choice is binding. Projects already commissioned before the amendment takes effect may opt into (h-i) by undertaking within one month, with waiver running from the date power is scheduled under the qualifying contract (p3).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (5)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.