CERC · Central Electricity Regulatory Commission

Public hearing notice — Sharing of inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026

Public hearing on Draft Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) (Fifth Amendment) Regulations, 2026.

Hearing notice on a draftDated 18 Sep 2026L-1/250/2019/CERC dated 18.09.2026

Draft

Voltaic holds no final regulation made from this draft.

Hearing notice on the Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page CERC public notice (p1) announcing an oral public hearing on the draft CERC (Sharing of inter-State Transmission Charges and Losses) (Fifth Amendment) Regulations, 2026. It records that the draft was issued on 31.07.2026 and that the window for written comments closed on 15.09.2026, and it fixes the hearing for 28.09.2026 (p1).

The notice is addressed to a wide stakeholder set: Central and State Governments, Load Despatch Centres, State Utilities, CPSUs, CTUs/STUs, transmission and trading licensees, power exchanges, individual experts, NGOs, IPPs, financial institutions, consultancy firms and any other organisations (p1).

It is procedural rather than substantive: it sets out how to take part. Intending participants must send the names of their proposed representatives by 24.09.2026, a Microsoft Teams link will be shared, and any presentation is capped at 5–10 minutes and 8–10 slides, with an advance copy emailed by 24.09.2026 (p1).

Standard name
Sharing of Inter-State Transmission Charges and Losses

Read with this

Other copies of these documents (5)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document