Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (FirstAmendment) Regulations, 2023

Amendment · Gazette copyDated 7 Feb 2023Published in the Gazette 1 Mar 2023F. No.L-1/250/2019/CERC dated 7th February, 2023

The Gazette copy of the Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment to the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020, issued by the Central Electricity Regulatory Commission under section 178 read with Part V of the Electricity Act, 2003 (p12). It retunes the sharing regime so that it works with the General Network Access framework introduced by the CERC (Connectivity and GNA to the inter-State Transmission System) Regulations, 2022. The notification was signed on 7 February 2023 (p12) and published in the Gazette of India, Extraordinary on 1 March 2023 (p1). Commencement is not tied to the Gazette: the regulations take effect from a date to be notified by the Commission (p12). Pages 1–11 carry the Hindi text; the English operative text begins at p12.

The amendment rewrites the vocabulary and the allocation logic. It re-anchors 'Associated Transmission System' to the GNA Regulations, replaces Medium/Long Term Open Access references with GNA/GNARE/T-GNA/T-GNARE, introduces 'Drawee DIC', 'GNA Regulations' and 'LPS Rules', deletes several definitions, and aligns all references to future amendments and re-enactments (p12). Sharing of the National Component, regional charges and AC-BC charges is re-based on each drawee DIC's quantum of GNA and GNARE, and the old 'injecting DICs with untied LTA' categories are removed (p12–13).

Regulation 11 becomes 'Transmission charges for T-GNA and T-GNARE', with a State-wise T-GNA rate published monthly by the Implementing Agency and reimbursement to drawee DICs in the following month's first bill (p13–14). Regulation 12 is replaced with a new transmission-deviation computation for generating stations (including ESS and captive plants), States and regional drawee entities, plus a State-level deviation rate formula, with carve-outs for hydro peak-season overload schedules and primary-response over-injection (p14). Regulation 13 is heavily rewritten: a revised waiver regime for solar, wind, solar-wind hybrid, Hydro PSP and BESS projects, with eligibility pegged to commercial-operation windows and declining waiver periods, and detailed conditions including a minimum share of renewable electricity for ESS charging, hydro and battery-ESS timelines, a step-down table for projects after 30 June 2025, and treatment of replacement power (p14–17). Conditions for delayed connectivity, associated transmission system charges, dedicated lines, start-up and auxiliary power, infirm power and who pays for delayed intra-State transmission, ESS and renewable park projects are all specified (p16–17).

Billing, letter-of-credit and default provisions are re-pointed to the Electricity (Late Payment Surcharge and Related Matters) Rules, 2022 (p17–18); the Implementing Agency must publish revised procedures within 45 days of notification after stakeholder consultation (p18); and Annexure-I's marginal participation flow treatment is changed (p18). Annexure-III (p18–20) sets out the methodology for computing waiver of transmission charges for drawee DICs holding GNA/GNARE and T-GNA/T-GNARE, including how the waiver amount is folded into the first bill.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Connectivity and GNA, Energy storage deployment

Read with this

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.