Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Draft

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2019

Draft regulationDated 31 Oct 2019No.L-1/250/2019/CERC dated 31st October 2019

Draft

A proposal that has since been finalised as the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission issued this draft notification on 31 October 2019, proposing the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2019 (p1). It is made under s.178 read with Part V of the Electricity Act, 2003, and would apply to all Designated ISTS Customers, inter-State transmission licensees, NLDC, RLDCs, SLDCs and RPCs (p1). It would come into force on a date to be separately notified by the Commission (p1). It is intended to replace the 2010 Sharing Regulations (p30).

Chapter 1 (pp1-5) sets the title, application and commencement, and defines core terms such as DIC, Basic Network, Hybrid Methodology, Implementing Agency, YTC, MTC, Participation Factor, SIL, Target Region, Untied LTA Capacity and Transmission Deviation.

Chapter 2 (pp6-12) specifies the components of ISTS transmission charges: National Component (split into RE and HVDC), Regional Component (residual HVDC plus stability devices), Transformers Component (state-specific), and AC System Component (split into usage-based AC-UBC and balance AC-BC). It sets out how each component is shared among drawee and injecting DICs by LTA plus MTOA or untied LTA capacity. Regulation 9 gives the AC-UBC computation: base case for the peak block, load-flow study, percentage usage against SIL, modified line-wise charges, node-wise charges by Hybrid Methodology, and state aggregation. Regulation 10 sets weekly All India Average Transmission Losses and scheduling adjustments.

Chapter 3 (pp12-18) covers specific cases: conditional transmission charge and loss exemptions for solar and wind projects; treatment of LTA/MTOA for tied-up power; delayed COD of generating stations and associated transmission; start-up power; part operationalisation of LTA; dedicated transmission lines; deemed COD under TBCB; and intra-State transmission assets used for inter-State transmission.

Chapter 4 (pp18-26) sets accounting, billing and collection: accounting by RPCs, billing timelines, three bill categories (First, Second for revisions, Third for transmission deviation), due date, rebate and late payment surcharge, letter of credit requirements, collection and disbursement, events of default and termination, and the transition period.

Chapter 5 (pp26-29) deals with information and procedures: Implementing Agency to notify detailed procedures and formats, audit of software, data submission timelines, penalties for non-submission, and publication of base case, assumptions, charges and interactive query results.

Chapter 6 (p30) repeals the 2010 Sharing Regulations with savings, and gives the Commission power to relax provisions and remove difficulties. Annexure I (pp31-44) details the Hybrid Methodology for usage-based transmission charges, using Average Participation to identify slack buses and Marginal Participation to compute charges, with steps, formulas and illustrative examples. Annexure II (p45) gives Surge Impedance Loading values for voltage and conductor configurations.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Losses and loss reduction, Payment security

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document