Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2023

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Third Amendment) Regulations, 2023

AmendmentDated 26 Oct 2023No. L-1/250/2019/CERC1 dated 26.10.2023

Amends the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page CERC notification amending the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020 — the "Principal Regulations" — in respect of how the yearly transmission charges of inter-regional HVDC systems that run in reverse direction are split between the National and Regional components (p1).

Regulation 1 gives the short title and states that the amendment takes effect from the date of publication in the Gazette (p1). Gazette date is not printed in the text, so the exact commencement date is not determinable from the document.

Regulation 2 inserts a new proviso into sub-clause (d) of Clause (3) of Regulation 5 of the Principal Regulations. It deals with an inter-regional HVDC system that was planned to supply a particular region but is operated to carry power in the reverse direction because of system requirements, and fixes the minimum share of its Yearly Transmission Charges that must fall in the National component, cross-referring to Regulation 6(1)(a) (p1).

Regulation 3 substitutes sub-clause (a) of Clause (1) of Regulation 6, re-defining the Regional Component of HVDC (RC-HVDC) and carving out HVDC systems already covered by Regulation 5(3)(a)–(c) (p1–2). The substituted clause contains the operative machinery: a formula expressing reverse-direction flow as a percentage of forward-direction flow capacity, and a two-limb rule — above a threshold the charge corresponding to that percentage goes to the National component with the balance in the Regional component, and at or below the threshold a fixed split applies (p2). A further proviso requires the National Load Despatch Centre to certify the reverse-direction MW capacity on the basis of actual power flow equal to such capacity (p2).

A closing Note records the Gazette publication particulars of the Principal Regulations and of the First Amendment Regulations, 2023 (p2). The Note as printed stops after the First Amendment.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document