Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Supplementary Explanatory Memorandum — Draft

Supplementary draft notification to the Draft Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Fifth Amendment) Regulations, 2026.

Explanatory memorandum to a draftDated 26 Oct 2026No. L-1/250/2019/CERC dated 26.10.2026

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Explanatory Memorandum dated 26.10.2026, accompanying a supplementary draft notification to the Draft CERC (Sharing of Inter-State Transmission Charges and Losses) (Fifth Amendment) Regulations, 2026. It sets out the background to a proposed amendment to Regulation 13(2) of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020 (the Principal Regulations), which would insert new sub-clauses (h-i) and (h-ii) to extend the graded waiver of inter-state transmission charges for renewable energy projects delayed by transmission system readiness.

The memorandum recites two Ministry of Power communications: OM dated 16.04.2026, which permits graded waiver of 75%/50%/25% for projects with firm PPAs and connectivity start dates in a specified window, and OM dated 05.10.2026, which changes the baseline for waiver eligibility to the later of the connectivity start date communicated by CTU as on the date of signing the PPA/PSA, and the SCOD in the PPA/PSA. The memorandum explains that the proposed supplementary amendment incorporates the 05.10.2026 OM, while other conditions (firm PPA, COD timeline) continue under the 16.04.2026 OM. It clarifies the treatment of direct PPAs and back-to-back PPAs/PSAs through traders or REIAs, and states that projects achieving COD before the amendment's effectiveness may opt in.

The memorandum also sets conditions for extension and termination of the PPA/PSA and caps cumulative waiver at 25 years. Two worked illustrations (pp. 5–6) demonstrate how the waiver slab and period would operate, including changes from 50% to 75% for a project with prior COD, and fallback to the trajectory under Regulation 13(2)(a) where the new sub-clauses do not apply. The explanations for the 7-year PPA/PSA tenure and the two-month COD timeline are not repeated here, as they were given in the explanatory memorandum to the 31.07.2026 draft.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (5)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.