Skip to content

CERC · Central Electricity Regulatory Commission

Errata (Gazette No. 544)

CorrigendumDated 25 Jul 2025Published in the Gazette 6 Aug 2025F. No. L-1/250/2019/CERC dated 25th July, 2025

Corrects the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC erratum correcting the English version of the CERC (Sharing of Inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2025. Rather than listing typographical fixes, it directs that pages 7 to 12 of the earlier Gazette publication (No. 472, 02.07.2025) be read as the text reprinted here — so the errata, dated 25 July 2025, carries the authoritative English wording of the Fourth Amendment (p7).

The reprinted text opens with the short title and commencement (effect from Gazette publication) and then amends the Principal Regulations, 2020 clause by clause (p8). It inserts new definitions in Regulation 2, substitutes a proviso in Regulation 9(8) on apportionment of AC-UBC charges among drawee DICs holding separate GNA, and adds provisos to Regulation 12(1)(a) on computing transmission deviation for generating stations with dual ISTS/intra-State connectivity, with STU to share Access details with NLDC and CTU (p8).

The bulk is a rewritten Regulation 13 (p8–11): a complete waiver regime for inter-state transmission charges, expressed as COD-linked eligibility tables for RE and hybrid generating stations, hydro and battery storage, hydro generating stations, offshore wind, and green hydrogen/green ammonia plants, together with conditions on grid charging, collocated RE, worked illustrations, extension of scheduled COD for force majeure, self-declaration and ex-post NLDC verification of the RE-charging criterion, terminal bay charges where a connectivity grantee's COD is delayed, and two new clauses on transmission system availability and CTU apportionment of yearly transmission charges. A closing Note lists the publication references of the Principal Regulations and the First to Third Amendments (p11).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Connectivity and GNA, Energy storage deployment

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document