Skip to content

CERC · Central Electricity Regulatory Commission

Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Third Amendment, 2023 — Statement of Reasons

Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) (Third Amendment) Regulations, 2023

Statement of reasonsDated 30 Oct 2023L-1/250/2019/CERC dated 30.10.2023

The commission's reasons for the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons (File No. L-1/250/2019/CERC, dated 30.10.2023) for the CERC (Sharing of inter-State Transmission Charges and Losses) (Third Amendment) Regulations, 2023. It is the consultation record behind the draft notified on 12.06.2023, not the amending text itself. Page 1 sets out the file number, date and coram, and records that written comments came from 10 stakeholders and that a public hearing was held on 05.09.2023.

Pages 3–7 reproduce stakeholder objections — almost all from Southern Region parties — to the draft's proposal to move part of an inter-regional HVDC link's Yearly Transmission Charges into the National Component according to the extent of reverse (bi-directional) flow. IWPA, PCKL, KPTCL, TANGEDCO, KSEBL, APPCC, Sembcorp, SRPC, GRIDCO, BYPL, MSEDCL and MPPMCL argue variously for full National Component treatment, capacity-based rather than flow-based sharing, average daily flow instead of instantaneous flow, or shifting the charges to the drawing region's Regional Component; several ask why Raigarh–Pugalur–Thrissur is treated differently from Biswanath-Chariali/Alipurduar–Agra and Mundra–Mohindergarh.

Pages 8–12 give the Commission's analysis and decision. It declines to tie sharing to real-time flows, so as not to expose Grid-India NLDC to pressure over HVDC DC set points, and relies instead on the link's reverse-flow capacity relative to its forward capacity; it requires reverse capacity to be established by actual flow and tested when COD is declared, and says reverse capacity should be discussed during CTU planning. It explains that the two other HVDCs are outside this amendment's scope but that their National/Regional split may be reviewed by a later amendment, and clarifies that APTEL's 18.07.2023 order did not direct withdrawal of the draft. Appendices I and II list who commented in writing and who appeared at the hearing.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document