Skip to content

CERC · Central Electricity Regulatory Commission

Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Commencement Notification, effective 01.11.2020

Notification – effective date 01.11.2020

Commencement noticeDated 8 Aug 2020No.L-1/250/2019/CERC dated 8

Commencement notice for the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 or one of its amendments. The dates are in the notice.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A single-page CERC notification (No. L-1/250/2019/CERC, dated 8 August 2020) that fixes the date on which the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020 come into force (p1).

It recites that the 2020 Regulations were published in the Gazette of India Extraordinary (Part-III, Section-4, No. 243) on 01.07.2020, and that Regulation 1(3) of those regulations left commencement to a date to be notified by the Commission (p1). The operative sentence then notifies 01.11.2020 as that commencement date (p1).

The document does nothing else: no substantive provisions, no amendments, no schedules, no savings. Its only function is to switch the 2020 sharing regulations on, and to evidence the Commission's use of the deferred-commencement mechanism it wrote into Regulation 1(3).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document