Draft Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2023 — Explanatory Memorandum

Draft Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Third Amendment) Regulations, 2023

Explanatory memorandum to a draftDated 12 Jun 2023L-1/250/2019/CERC dated 12.06.2023

Explanatory memorandum to the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Third Amendment, 2023 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is CERC's Explanatory Memorandum dated 12.06.2023 for the draft Third Amendment to the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020. It is a rationale document, not the amending text: it explains why CERC proposes to change the way charges for certain HVDC inter-regional links are shared, and it does not reproduce the draft amendment provisions (p1).

The background recites the Sharing Regulations, 2020, effective 1.11.2020, and their four charge components — National, Regional, Transformer and AC System. It records that HVDC systems other than back-to-back substations currently share charges 70% under the Regional Component and 30% under the National Component (p1). It then explains the origin of that split: HVDC bipole systems were planned to serve particular regions, but the Jha Committee Report treated 30% of bulk-transfer HVDC charges as national because HVDC control features support grid stability (pp1–2). It quotes the Statement of Reasons for the 2020 Regulations, which left open a change to sharing based on bidirectional power flow if needed (p2).

The memorandum says the Ministry of Power asked CERC on 30.05.2022 to consider HVDC inter-regional link charges under the National Component based on bidirectional flow (p2). It reports Grid-India's 09.12.2022 study of the Raigarh–Pugalur–Thrissur HVDC, showing changed NEW–SR corridor flows and growth in Southern Region RE capacity (p3). It details the line's forward and reverse capacities, noting reverse capability is only half of forward capacity, and argues that including more than 50% of YTC in the National Component is not appropriate (p3). A monthly power-flow table for April 2022–April 2023 shows high reverse flows in May–September 2022 and dominant forward flows from November 2022 (pp3–4). It concludes that the HVDC line is critical for Southern Region demand and for renewable integration (p4).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document