Task Force Report to Review Framework of Point of Connection (PoC) Charges, 2019

Report of CERC Task Force to Review Framework of Point of Connection (PoC) Charges

Explanatory memorandum to a draftReleased with the notice dated 31 Oct 2019

Draft

The draft has since been finalised as the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020.

Explanatory memorandum to the Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the March 2019 report of a CERC Task Force chaired by A.S. Bakshi, constituted by Office Order dated 10.7.2017 (p28, p31) to review the Point of Connection (PoC) framework for sharing inter-state transmission charges and losses. The Executive Summary (pp16–27) sets out the central proposals: two alternative transmission pricing methods — a modified PoC method and a uniform charges method. Modified PoC would compute charges ex-post each month on actual all-India peak data and split each AC line's monthly transmission charge into four components: a PoC usage component billed on 15-minute actual drawal/injection; a reliability component based on N-1 contingency flows shared by non-coincident peak; a residual component shared by LTA/MTOA; and HVDC charges on causer-pays. Uniform charges would divide monthly AC and back-to-back HVDC charges by average ISTS drawal/injection and bill on actual drawal/injection. The report also recommends separately identifying renewable-evacuation assets and allocating their cost by contracted capacity.

Chapter 1 (pp28–60) records the Task Force's constitution, terms of reference and eight meetings between July 2017 and March 2019. Chapter 2 (pp61–82) gives the pre-PoC regional postage-stamp history, the legal framework under the Electricity Act 2003, the PoC methodology's distance/direction/quantum rationale, the principal Sharing Regulations 2010, and the five amendments up to 14.12.2017. Chapter 3 (pp83–87) summarises stakeholder comments. Chapter 4 (pp88–325) is the analytical core: it tests whether PoC met Tariff Policy objectives, reviews its role in power market development, analyses deficiencies and stakeholder concerns (transparency, slabs, cost averaging, ex-ante vs ex-post, generator-vs-load payment, telemetry, reliability charge, HVDC, GNA, STOA rates), surveys international practice, presents NLDC comparative simulations, and gives final transmission pricing recommendations. It also covers transmission utilisation, reactive power, and ATC/TTC assessment (pp292–325). The bibliography is at pp326–327. Annexure-I (Office Order 10.7.2017) and Annexure-II (Office Order 6.8.2018) are listed at pp301 and 303. The report is advisory and does not itself notify a regulation.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Open access charges, Losses and loss reduction

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.