CERC · Central Electricity Regulatory Commission

Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2023

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Third Amendment) Regulations, 2023

Amendment · Gazette copyDated 26 Oct 2023Published in the Gazette 27 Oct 2023No. L-1/250/2019/CERC1 dated 26th October, 2023

The Gazette copy of the Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short CERC amendment that changes how the yearly transmission charges of inter-regional HVDC systems are split between the National component and the Regional component when such a system, though planned to supply a particular region, is run in the reverse direction for system reasons (p3).

It inserts a proviso into sub-clause (d) of clause (3) of Regulation 5 of the 2020 Sharing of ISTS Charges and Losses Regulations, requiring that the share of such a system's Yearly Transmission Charges placed in the National component be 30% or more, consistent with Regulation 6(1)(a) (p3).

It then substitutes Regulation 6(1)(a), which defines the Regional Component of HVDC (RC-HVDC) as 70% of the Yearly Transmission Charges of HVDC systems planned to supply the region, excluding systems already covered by Regulation 5(3)(a)–(c), and sets out the formula for the reverse-flow ratio HVDCr — reverse-direction MW capacity divided by forward-direction MW capacity, expressed as a percentage. Where HVDCr exceeds 30%, the Yearly Transmission Charges corresponding to HVDCr go to the National component and the balance to the Regional component; where HVDCr is 30% or less, 30% goes to the National component and 70% to the Regional component. The reverse-direction MW capacity must be certified by NLDC on the basis of actual power flow (p3).

The regulations take effect from gazette publication; the notification is dated 26 October 2023 and the gazette copy is dated 27 October 2023 (p1, p3). A closing Note records the gazette publication dates of the 2020 principal regulations and of the First Amendment Regulations, 2023 (p3).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document