CERC · Central Electricity Regulatory Commission

Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Removal of Difficulties Order, 2022

Removal of difficulties to extend certain provisions of the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020.

OrderDated 30 Dec 2022No. L-1/250/2019/CERC dated 30

Made under the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short, single-issue order of the Central Electricity Regulatory Commission, issued under the removal-of-difficulties power in Regulation 28 of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020 (the "2020 Sharing Regulations"), notified 4 May 2020 and in effect from 1 November 2020 (p1).

The problem it addresses is narrow. Regulation 13(1)(c) of the 2020 Sharing Regulations grants solar and wind generators a 25-year waiver of inter-State transmission charges, but only if the capacity was declared under commercial operation between 13.2.2018 and 31.12.2022 and other conditions (bidding under Central Government guidelines; PPAs executed for sale to all entities including discoms for RPO compliance) are met (p1–2). The Commission was already processing a draft First Amendment, notified for comment on 01.06.2022, plus a draft Supplementary Amendment dated 18.08.2022, but finalisation and notification would take more time, leaving generators without clarity as the 31.12.2022 cut-off approached (p2–3).

Using Regulation 28, the Commission extends the commercial-operation deadline for the waiver from 31.12.2022 until 30.06.2023, or until the First Amendment is notified and takes effect, whichever is earlier (p3). It is a holding measure: the eligibility conditions themselves are untouched, and the extension lapses as soon as the amendment regime arrives. Signed by all three Members (p3).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗