Skip to content

CERC · Central Electricity Regulatory Commission

Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Public Notice Extending Comment Deadline

Draft Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2019 (Extension of time) reg.

Notice extending the date for comments on a draftDated 2 Dec 2019No.L-1/250/2019/CERC dated 2.12.2019

Draft

The draft has since been finalised as the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020.

Notice extending the date for comments on the Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page public notice from the Central Electricity Regulatory Commission extending the deadline for stakeholder comments on the draft Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2019 (p1).

Comments had been invited by 2 December 2019 under Public Notice No. L-1/250/2019/CERC dated 31.10.2019 (p1). FICCI, MB Power (Madhya Pradesh) Ltd., TANGEDCO, WBSEDCL, GUVNL, TPTCL, GRIDCO and Adani Transmission Limited requested more time, and the Commission, keeping in view the stakeholders' request, extends the last date for submission of comments to 31 December 2019 (p1).

The notice contains no substantive content on how inter-state transmission charges or losses are to be shared; that sits in the draft regulations themselves, which this notice only concerns procedurally. It is signed by the Chief (Engineering) (p1).

Standard name
Sharing of Inter-State Transmission Charges and Losses

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document