CERC · Central Electricity Regulatory Commission
Draft Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 and Supplementary Amendment — Explanatory Memorandum
Draft Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (First Amendment) Regulations, 2022 along with Draft Supplementary Amendment
Explanatory memorandum to a draftDated 19 Sep 2022No.L-1/250/2019/CERC dated 19.09.2022
Draft
The draft has since been finalised as the Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023.
Explanatory memorandum to the draft Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — public hearing rescheduling notice.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Pages 1–2 explain why CERC is consulting on changes to the 2020 Sharing Regulations: issues raised by CTU and NLDC, and the need to align with the GNA Regulations 2022. It lists four broad proposals: sharing ISTS charges among drawee DICs, a waiver methodology for drawl from specified RE sources, alignment of LTA/MTOA with GNA, and other amendments.
Section 2 (pp2–6) sets out the rationale for charging drawee DICs rather than all DICs, following GNA Regulation 40.1. It proposes a new definition of “Drawee DIC” that leaves out ESS, and consequential changes to Regulations 2, 3, 5, 6, 7, 8, 9 and 19 and Annexure-I. It also flags a drafting error in Regulation 3(3), where two different substitutions were proposed.
Section 3 (pp6–15) is the longest. It explains why the old RE waiver linked to LTA and PPA no longer fits GNA, reproduces NLDC’s concern about exempt RE LTA being used as a buffer for conventional power, and sets out the supplementary amendment. That amendment would substitute Regulation 13(1) with a formula-based waiver of transmission charges for the GNARE quantum used to schedule REGS/RHGS wind or solar or ESS charged from them, subject to a denominator floor; it also substitutes Regulation 3(3) and adds a proviso to Regulation 10(2). The section reproduces the MOP order of 23.11.2021, including its COD cutoff of 30.6.2025 and post-2025 charge trajectory, and gives four numerical illustrations. It closes by noting the waiver covers charges, not losses, except for projects bid before 15.1.2021.
Section 4 (pp15–23) aligns the 2020 Sharing Regulations with GNA. It proposes amendments to definitions and Regulations 11, 12, 13, 14, 19, 24 and 25, replaces LTA/MTOA with GNA/T-GNA, deletes references to the 2009 Connectivity Regulations, 2008 Open Access Regulations and 2010 Power Supply Regulations, and sets out proposed T-GNA and transmission deviation rate formulas and delayed-COD treatment.
Section 5 (pp24–26) covers other amendments — Transformer Component, Regulation 13(12) on mismatches, and the second-bill schedule.
Read with this
The regulation
Amendments and corrections
- Dated 7 Feb 2023Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023
- Dated 28 Sep 2023Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023 — Corrigendum
- Dated 28 Sep 2023Corrigendum to the Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023
- Dated 20 Oct 2023Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023
- Dated 26 Oct 2023Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2023
- Dated 26 Jun 2025Sharing of Inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2025
- Dated 25 Jul 2025Errata (Gazette No. 544)
Commencement notices and reasons
- Dated 8 Aug 2020Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — commencement notification
- Dated 8 Aug 2020Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Commencement Notification, effective 01.11.2020
- Dated 10 Aug 2020Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Statement of Reasons
- Dated 3 Aug 2023Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023 — Commencement Notification
- Dated 3 Aug 2023Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023 — Commencement Notification
- Dated 30 Oct 2023Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Third Amendment, 2023 — Statement of Reasons
- Dated 31 Jul 2024Sharing of Inter-State Transmission Charges and Losses, 2020 — Second Amendment, 2023 — Statement of Reasons
Procedures and orders made under it
- Dated 14 Feb 2021Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Removal of Difficulties Order
- Dated 30 Dec 2022Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Removal of Difficulties Order, 2022
- Dated 12 Jun 2023Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Removal of Difficulties Order, 2023
- Dated 30 Jul 2025Constitution of Committee for Extension of SCOD under Sharing Regulations, 2020 — Office Order, 2025
- Dated 14 Jan 2026Addendum to Office Order dated 30.07.2025 — SCOD extension Committee, Sharing on Inter-State Transmission Charges and Losses Regulations, 2020
Other copies of these documents (5)
- Dated 4 May 2020Sharing of Inter-State Transmission Charges and Losses Regulations, 2020
- Dated 7 Feb 2023Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2023
- Dated 20 Oct 2023Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023
- Dated 26 Oct 2023Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2023
- Dated 26 Jun 2025Sharing of Inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2025
Proposed changes (drafts with no final yet)
- Dated 31 Jul 2026Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Draft
- Dated 31 Jul 2026Public notice: Sharing of inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Public Notice — Draft
- Dated 31 Jul 2026Explanatory memorandum: Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 3 Sep 2026Notice extending the date for comments: Public notice extending comment deadline on Draft Sharing of inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026
- Dated 18 Sep 2026Hearing notice: Public hearing notice — Sharing of inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026
- Dated 26 Oct 2026File: Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Fifth Amendment, 2026 — Supplementary Draft Notification
- Dated 26 Oct 2026Public notice: Sharing of inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Supplementary Draft — Public Notice
- Dated 26 Oct 2026Explanatory memorandum: Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Supplementary Explanatory Memorandum — Draft
- Dated 16 Nov 2026Hearing notice: Draft Sharing of inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2026 — Public Hearing Notice, 2.12.2026
Earlier drafts
- Dated 31 Oct 2019Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Draft
- Dated 31 Oct 2019Public notice: Public Notice on Draft Sharing of Inter-State Transmission Charges and Losses Regulations, 2019
- Released with the notice dated 31 Oct 2019Explanatory memorandum: Task Force Report to Review Framework of Point of Connection (PoC) Charges, 2019
- Released with the notice dated 31 Oct 2019Explanatory memorandum: Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Draft
- Dated 2 Dec 2019Notice extending the date for comments: Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Public Notice Extending Comment Deadline
- Dated 3 Dec 2019Explanatory memorandum: Explanatory Memorandum to Draft Sharing of Inter-State Transmission Charges and Losses Regulations, 2019
- Dated 9 Jan 2020Hearing notice: Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Public Hearing Notice, 29.01.2020
- Dated 29 Sep 2022Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — public hearing rescheduling notice
- Dated 11 Jun 2022Public notice: Draft Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — Public Notice
- Dated 11 Jun 2022File: Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — Draft
- Dated 9 Jul 2022Notice extending the date for comments: Public Notice — Extension of comments deadline on Draft Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022
- Dated 18 Aug 2022Notice extending the date for comments: Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — Supplementary Notification (Public Notice)
- Dated 18 Aug 2022File: Supplementary Draft Notification — Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022
- Dated 21 Sep 2022Hearing notice: Draft Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — Public Hearing Notice
- Dated 21 Sep 2022Notice extending the date for comments: Draft Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — comment deadline extension notice
- Dated 17 Mar 2023Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023 — Draft
- Dated 17 Mar 2023Public notice: Draft Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023 — Public Notice
- Dated 24 Mar 2023Explanatory memorandum: Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 26 Apr 2023Hearing notice: Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023 — Public Hearing Notice
- Dated 12 Jun 2023Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Third Amendment, 2023 — Draft
- Dated 12 Jun 2023Explanatory memorandum: Draft Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2023 — Explanatory Memorandum
- Dated 12 Jun 2023Public notice: Sharing of Inter-State Transmission Charges and Losses — Third Amendment, 2023 — Public Notice — Draft
- Dated 28 Aug 2023Hearing notice: Rescheduling of Public Hearing for Draft Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2023
- Dated 9 Oct 2024Sharing of Inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2024 — Draft
- Dated 9 Oct 2024Public notice: Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 28 Oct 2024Explanatory memorandum: Sharing of Inter-State Transmission Charges and Losses, 2020 — Fourth Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 11 Nov 2024Notice extending the date for comments: Extension of last date for comments on Draft Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2024 — Public Notice
- Dated 10 Dec 2024Hearing notice: Public hearing notice — Draft Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2024
11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.