Skip to content

CERC · Central Electricity Regulatory Commission

Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2023

AmendmentDated 20 Oct 2023In force from 1 Nov 2023No. L-1/250/2019/CERC dated 20th October 2023

Amends the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's second amendment of 2023 to the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020, issued on 20 October 2023 under s.178 read with Part V of the Electricity Act, 2003 (p1). It takes effect from 1 November 2023 (p1), and it is entirely about one problem: what happens to transmission charges when an inter-State transmission element is treated as commissioned before power actually flows.

The core change is a new definition. Regulation 2 gains sub-clause (i-i) defining "Deemed COD" — separately for elements under the regulated tariff mechanism (approved by the Commission under the Grid Code 2023 or the Tariff Regulations) and for elements awarded under Tariff Based Competitive Bidding (declared by the transmission licensee under the Grid Code proviso or under a Transmission Service Agreement predating 1 October 2023) (p1–2).

Regulations 11 and 12 are then touched only to re-sequence adjustments: charges are to be adjusted in a specified order against the billing-month mechanism in Regulation 13 (p2). Regulation 13(3) is reworded from "is delayed" to "has not been achieved" (p2).

The substantive rewrite is Regulation 13(12) (p2–5), which replaces the treatment of Yearly Transmission Charges for deemed-COD elements not covered by the other clauses of Regulation 13. It sets out a staged YTC payment regime after deemed COD; a funding waterfall for those payments (billing-month collections first, then T-GNA/T-GNARE, then the Deviation and Ancillary Service Pool Account under the DSM Regulations); an exclusion for transformer-component elements; a liability regime making a delayed inter-State licensee (or intra-State licensee) pay a share of YTC of the delayed system or of the system that has achieved deemed COD, whichever is lower, with set-off against liquidated damages and override of contrary TSA terms; billing through Regulation 15(3); reimbursement; and the start of the first contract year for TBCB systems. A closing Note records the Gazette publication details of the Principal Regulations (1 July 2020) and the First Amendment (1 March 2023) (p5).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Competitive bidding

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document