Sharing of Inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2025

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2025

Amendment · Gazette copyDated 26 Jun 2025F.No. L-1/250/2019/CERC— dated 26th June, 2025

The Gazette copy of the Sharing of Inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Fourth Amendment to CERC's regulations on sharing inter-State transmission charges and losses was notified in New Delhi on 26 June 2025 (p7). It largely rewrites the waiver regime for transmission charges and makes a set of technical corrections to the 2020 principal regulations elsewhere. The operative text is in English on pp7–12, preceded by Hindi versions of the waiver tables on pp3–6.

Regulations 2, 9 and 12 cover definitions and charge apportionment. Two definitions are inserted — 'Tariff Regulations' (the CERC Tariff Regulations, 2024) and 'Terminal Bay' (adopting the meaning in the GNA Regulations) (p7). A substituted proviso to Regulation 9(8) fixes how a state's aggregate AC-UBC charges are apportioned to drawee DICs that are not the state's distribution licensees, hold separate GNA and sit outside the licensees' GNA (p7). Regulation 12 gains two provisos on how transmission deviation is computed for a generating station with dual ISTS and intra-State connectivity, and requires the STU to share access details with NLDC and CTU (p7).

The bulk of the amendment is Regulation 13. Substituted sub-clauses (2)(a) and (b), new heads (e) and (f) and new sub-clauses (h) and (i) restate who is eligible for waiver and what share of the drawal schedule is counted under Annexure-III — wind/solar REGS and RHGS, battery ESS, hydro PSP ESS, hydro generating stations, offshore wind, and green hydrogen/green ammonia plants — with worked illustrations (pp7–11). New sub-clauses (h) and (i) allow time extensions for force majeure where the scheduled COD fell on or before 30 June 2025, and let ESS self-declare the 51% renewable-charging test pending NLDC verification (pp10–11). Regulation 13(3), (6) and new clauses (14) and (15) deal with terminal bay charges payable by connectivity grantees, the renaming of 'Associated Transmission System' to 'Associated Transmission System and Terminal Bay(s)', availability of the transmission system being governed by the Tariff Regulations regardless of a TBCB transmission service agreement, and CTU apportionment of yearly transmission charges where element-wise figures are unavailable (pp11–12). A closing note lists the Gazette references for the principal 2020 regulations and the first three amendments (p12).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Connectivity and GNA, Energy storage deployment

Read with this

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document