Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2023 — Draft

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2023

Draft amendmentDated 17 Mar 2023L-1/250/2019/CERC dated 17.03.2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's draft Second Amendment, 2023 to the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020, issued for previous publication on 17 March 2023 (p1). It makes one substantive change — creating a payment bridge for inter-State transmission systems declared at 'deemed COD' that are not yet carrying power, and shifting the cost of delay onto whoever caused it.

Page 1 inserts a definition of 'Deemed COD' into Regulation 2, covering both a COD approved by the Commission under the Tariff Regulations, 2014 and 2019, and a deemed COD declared by the transmission licensee under a Transmission Service Agreement in Tariff Based Competitive Bidding (p1). Pages 2–4 carry the consequential changes: the cross-references in Regulation 11(3) and Regulation 12(3) are re-pointed to specified sub-clauses of Regulation 13(12) (p2); the trigger in Regulation 13(3) changes from a system that 'is delayed' to one that 'has not achieved COD' (p2); and Regulation 13(12) is replaced in full (p2–4).

The new Regulation 13(12) stages payment of Yearly Transmission Charges to the licensee between deemed COD and the start of actual power flow, funded through a waterfall running from the third bill, then T-GNA charges, then the Deviation and Ancillary Service Pool Account under the DSM Regulations (p3). It makes an inter-State transmission licensee whose delay blocks another licensee's deemed-COD system liable on a YTC basis, and does the same for an intra-State licensee whose delay blocks an inter-State system, with Force Majeure expressly not excusing liability (p3). Billing and collection follow Regulation 15(3) and reimbursement Regulation 12(3) (p3–4). For TBCB projects, the contract's first year begins only once the licensee starts receiving full YTC (p4).

Commencement is deferred to a date the Commission will notify, so the draft has no operative date of its own (p1). The closing Note fixes the Gazette identity of the Principal Regulations and of the First Amendment (p4).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Competitive bidding

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document