Skip to content

CERC · Central Electricity Regulatory Commission

Sharing of Inter-State Transmission Charges and Losses Regulations, 2020 — Third Amendment, 2023 — Draft

Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Third Amendment) Regulations, 2023

Draft amendmentDated 12 Jun 2023No. L-1/250/2019/CERC dated 12.06.2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page draft notification issued by CERC on 12 June 2023 (p1). It proposes the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Third Amendment) Regulations, 2023, framed under Section 178 read with Part V of the Electricity Act, 2003 (p1). It is explicitly a draft: clause 1 says the regulations take effect only from a date the Commission notifies, and no such date is printed (p1).

Clause 2 inserts a proviso into Regulation 5(3)(d) of the 2020 Principal Regulations, tying the share of Yearly Transmission Charges under that sub-clause to Regulation 6(1)(a) (p1).

Clause 3 is the operative core. It inserts a proviso into Regulation 6(1)(a) for inter-regional HVDC systems that run power in the reverse direction because of system requirements, and prescribes how such a system's Yearly Transmission Charges are divided between the national and regional components in that case (p1–2). It defines a percentage, HVDCr, computed month by month from the sum of the maximum reverse-direction flow in any time block on each day of the month, divided by the forward-direction capacity of the HVDC system times the number of days in the month (p1–2). Where HVDCr exceeds 30%, the Yearly Transmission Charges corresponding to HVDCr sit in the national component and the balance in the regional component; where it is below 30%, a fixed 30/70 national-regional split applies (p2).

The closing Note records when the Principal Regulations and the First Amendment were gazetted, and the Secretary signs off (p2). Nothing in the document fixes a commencement date; the amendment operates prospectively.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document