Sharing of Inter-State Transmission Charges and Losses, 2020 — Fourth Amendment, 2024 — Explanatory Memorandum — Draft

Draft Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2024.

Explanatory memorandum to a draftDated 28 Oct 2024No. L-1/250/2019/CERC

Explanatory memorandum to the Sharing of Inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Explanatory Memorandum for the draft Fourth Amendment to the 2020 Sharing Regulations, issued under file No. L-1/250/2019/CERC (p1). It is a reasons document, not operative text: it sets out why each change is proposed, quoting the stakeholder letters, Ministry of Power orders and Commission minutes relied on.

Section 1 recalls that the 2020 Sharing Regulations were notified on 4.5.2020 and effective from 1.11.2020, lists the three earlier amendments, and sets out the four topics the Fourth Amendment covers (p1).

Section 2 explains the proposal to specify a formula for transmission deviation for generating stations connected to both the ISTS and the STU system, prompted by an NTPC letter and by how WRPC's RTDA account treated one dual-connectivity station. Deviation is proposed to be net ex-bus injection above combined ISTS GNA and STU connectivity, with a worked illustration and a caveat that both networks must actually be commissioned to the required capacity (p1–3).

Section 3 covers the transmission-charge and loss amendments to Regulation 13 in five sub-parts. 3.1 incorporates the Ministry of Power's ISTS-charge waiver regime for offshore wind, green hydrogen/green ammonia and hydro PSP into Regulation 13(2), and proposes that a green hydrogen/ammonia plant receive the higher of the waivers available under the 2021 and 2023 orders, with examples (p3–7). 3.2 tightens the hydro waiver window so that both PPA signing and construction award fall after 1.12.2022 and by 30.06.2025 (p7–8). 3.3 aligns extension of scheduled commissioning for waiver purposes with the PPA and caps it at two extensions of six months, leaving other cases to the Commission (p8–9). 3.4 makes a connectivity grantee or renewable power park developer pay yearly transmission charges for a terminal bay built by a transmission licensee that has achieved COD while the grantee's has not (p9–10). 3.5 moves availability and deemed availability of ISTS elements into the Sharing Regulations, so that calculation follows the prevailing Tariff Regulations while target availability comes from the TSA, covering both TBCB and RTM projects (p11–16). The memorandum closes with a two-point illustration of that approach (p16).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Connectivity and GNA, Transmission availability and outages

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.