Explanatory Memorandum to Draft Sharing of Inter-State Transmission Charges and Losses Regulations, 2019

Explanatory Memorandum

Explanatory memorandum to a draftDated 3 Dec 2019No.L-1/250/2019/CERC

Draft

The draft has since been finalised as the Sharing of Inter-State Transmission Charges and Losses Regulations, 2020.

Explanatory memorandum to the Sharing of Inter-State Transmission Charges and Losses Regulations, 2019 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum to the Draft CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2019, issued on 3 December 2019. It is not the regulation text; it explains why the Commission proposes to replace the 2010 sharing framework and how the replacement would allocate ISTS charges and losses (p1, p5).

The opening sets out the legal basis and history: the 2010 Sharing Regulations were notified in 2010 and came into force in 2011, with six amendments, and the Commission set up the Bakshi Taskforce in 2017 to review point-of-connection charges. It summarises the taskforce's two options — a modified PoC method and a uniform-charge method — and records the Jha Committee's 2019 recommendation to recover ISTS costs through national, regional, transformer and AC-system components (p1–5).

The rest of the memorandum works through the proposed design. It describes the basic framework and each component: national treatment for renewable-linked and HVDC assets, regional allocation for HVDC and voltage-support devices, state-level allocation of drawal transformers, and an AC-system component split into usage-based and balance parts (p6–16). It then addresses special cases: generators connected to both ISTS and state networks, intra-state lines certified by RPCs, average transmission losses, short-term open access, transmission deviation charges, and liabilities when generators, transmission licensees or upstream/downstream systems are delayed (p16–34). Later sections cover part operationalisation of LTA, start-up power drawal, and the decision to fold TSA, RSA and billing/collection procedures into the regulations or CTU-issued procedures (p34–40).

The memorandum is essentially a policy rationale and drafting guide for stakeholders responding to the draft. It refers to draft regulation clauses and worked examples, but the operative regulations are not reproduced in the memorandum.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Losses and loss reduction, Open access

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document