Supplementary Draft Notification — Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022

Supplementary Draft Notification

Published with a draftDated 18 Aug 2022No. L-1/250/2019/CERC dated 18.08.2022

Published with the draft Sharing of Inter-State Transmission Charges and Losses (First Amendment) Regulations, 2022 — public hearing rescheduling notice.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This three-page CERC supplementary draft notification adds a further set of proposed amendments to the draft Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (First Amendment) Regulations, 2022, which was published on 11.06.2022 to amend the 2020 Principal Regulations on sharing inter-State transmission charges and losses (p1). It is a set of proposals, not a notified instrument.

Four additional changes are proposed. The definitional wording in Regulation 2(1)(j) of the Principal Regulations is to be recast from "Medium Term Open Access or Long Term Open Access" to "GNA or T-GNA" (p1). Regulation 3(3) is to be substituted so that the GNARE quantum computed under Regulation 13 is not counted in the apportionment of yearly transmission charges under Regulations 5 to 8 (p1). A proviso is to be added to Regulation 10(2) requiring transmission losses to be treated as zero when drawl schedules of designated customers are prepared for wind- or solar-based renewable sources, or storage charged from them, whose bidding was completed before 15.1.2021 (p1).

The heart of the document is the rewritten Regulation 13 (pp1–3). It creates two charge-exempt quanta — GNARE for GNA and T-GNARE for T-GNA — each computed by a monthly, time-block-level formula comparing the entity's drawl schedule from the covered sources to total drawl through ISTS from all sources, with a floor that substitutes 75% of the maximum schedule where actual total drawl falls short of that threshold (pp1–2). Amounts already paid as T-GNA charges are to be reimbursed ex-post once schedules are finalised, by the 15th of the following month (p2). Both sub-clauses apply only to projects that declare commercial operation up to 30.6.2025 (p3).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Connectivity and GNA, Losses and loss reduction

Read with this

Other copies of these documents (5)

Proposed changes (drafts with no final yet)

Earlier drafts

11 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft and 5 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document